Door Adjustment - Arrow Storage Products RV101467H2 Owner's Manual & Assembly Manual

Table of Contents

Advertisement

Step 17: Door Install
You will need for this page:
(QTY: 8)
1
From inside the building, place the
bottom of the Door into the Front
Floor Frame track at about the half-
open position.
2
Rotate the Door forward until it is
vertical and align the Door Slides
with the Door.
3
Insert two (2) Black Screws into each
Door Slide as shown below. Repeat
steps for second door.

Door Adjustment

If Doors do not align, raise or lower one side of the Door by placing
the Door screws through a different set of holes in the Door Slide.
Assemblies from Step 16:
Right Door Assembly (1)
Left Door Assembly (1)
Half-Open Position
Closed Position
41
Gable
Door Slide
Door Track
INSIDE BUILDING
Door
Front Floor Frame
42A

Advertisement

Table of Contents
loading

Table of Contents