Step 13: Roof Assembly - Arrow Storage Products RV101467H2 Owner's Manual & Assembly Manual

Table of Contents

Advertisement

Step 13: Roof Assembly

You will need for this page:
(QTY: 12)
1
Attach Back Right Roof Panel to Top Roof Beam only using
three (3) screws.
2
Remove Edge Trim from the Left Gable under the Roof
Panel.
3
Continue fastening Roof Panel to Gable and Lower Roof
Beam using seven (7) bolts and nuts and three (3) screws.
Do not fasten to Side Wall Angle at this time.
4
Install Back Left Roof Panel.
5
While installing Roof Panels use Weather
Stripping Tape to seal roof ridge.
Weather Stripping Tape
should be applied in a
continuous
strip
along
the length of the roof.
6189
Left Roof
(QTY: 14)
Panel
Front
6188
10
1
1
6188
Right Roof
Panel
An Awl may be used to help align holes
that are only slightly misaligned.
Take care not to bend or
warp the metal, and always
practice proper tool safety.
3
13
12
11
5
6
7
8
9
Back
Work one corner at a time. Be sure
to fi nish a corner before moving on to
the next one.
6
34
1
67545
Weather
Stripping
Follow the fastener
sequence shown for
proper alignment.
2
1
6189
4
Nut
Washer
34BF
Bolt
GABLE

Advertisement

Table of Contents
loading

Table of Contents