Keston 86-CM-44 User, Installation And Servicing Instructions page 15

Fan powered high efficiency modulating domestic condensing gas combination boiler
Table of Contents

Advertisement

WD388/0/2004
Chapter 3 - Boiler Location
3. BOILER LOCATION
3.1
DIMENSIONS AND MINIMUM
CLEARANCES
The boiler must be installed in minimum
clearances
shown
servicing, and safe operation. However, larger
clearances may be required during installation.
3.2
SERVICE CONNECTIONS
Without Optional Pre-Installation Jig:
Gas, water, air and flue pipe, condensation,
and electrical connections are as shown. Gas :
15mm compression. Flow/Return 0.75BSPM
compression.
compression.
With Optional Pre-Installation Jig:
Gas, water, air and flue pipe, condensation,
and electrical connections are as shown. Gas :
15mm compression. Flow/Return 22mm
compression.
compression.
An optional stand-off frame is also available
which mounts behind the boiler to leave a
50mm deep space behind the boiler. This is
to permit pipe routing behind the boiler if
required.
See
Accessories.
3.3
POSITION
The C36 Combi and C36P Combi are not
suitable for external installation. The boiler
may be installed in any room or internal
space, although particular attention is drawn
to the requirements of the current IEE Wiring
Regulations and, in Scotland, the electrical
provisions of the Building Regulations
Installation & Servicing Instructions
to
allow
subsequent
DHW/CWS
0.5BSPM
DHW/CWS
15mm
Section
2.5
-
Optional
The Keston C36 Combi & C36P Combi Boilers
$OO GLPHQVLRQV LQ PP

 :KHQ VHUYLFLQJ DSSOLDQFH
 :KHQ DSSOLDQFH LV RSHUDWLQJ
Figure 3.1.2
Dimensions
)OXH
$LU ,QWDNH

)LJXUH 

0LQLPXP &OHDUDQFHV
$OO GLPHQVLRQV LQ PP

Page : 10


Advertisement

Table of Contents
loading

This manual is also suitable for:

C36p combiC36 combi47-930-0147-930-02

Table of Contents