Two-stage, variable-speed, multipoise 35 in. (889 mm) tall, condensing gas furnace
Table of Contents

Advertisement

F96CTN and G96CTN (Series A): Installation, Start-up, Operating, Service and Maintenance Instructions
Example 2
A direct-vent 60,000 BTUH furnace installed at 2100 ft. (640M). Venting system includes FOR EACH PIPE:
100 feet (30 M) of vent pipe, 95 feet (29 M) of combustion air inlet pipe, (3) 90º long-radius elbows, and a polypropylene concentric vent kit. Also
includes 20 feet (6.1 M) of flexible polypropylene vent pipe, included within the 100 feet (30 M) of vent pipe.
VERIFY FROM POLYPROPYLENE VENT MANUFACTURER'S INSTRUCTIONS for the multiplier correction for flexible vent pipe.
Can this application use 60mm o.d. (2") polypropylene vent piping? If not, what size piping can be used?
Measure the required linear length of RIGID air inlet and vent pipe; insert the longest of the
two here: 100 ft. Of rigid pipe - 20 ft. Of flexible pipe
Add equiv length of (3) 90º long-radius elbows (use
the highest number of elbows for either the vent or
inlet pipe)
Add equiv length of 45º long-radius elbows
(use the highest number of elbows for either the
vent or inlet pipe)
Add equiv length of factory concentric vent term
Add correction for flexible vent pipe, if any
* VERIFY FROM VENT MANUFACTURER'S INSTRUCTIONS; For example only, assume 1 meter of flexible 60mm (2") or 80mm (3") polypropylene
Total Equivalent Vent Length (TEVL)
Maximum Equivalent Vent Length (MEVL)
Is TEVL less than MEVL?
Maximum Equivalent Vent Length (MEVL)
Is TEVL less than MEVL?
START-UP, ADJUSTMENT, AND SAFETY
CHECK
!
IMPORTANT INSTALLATION AND START-UP
PROCEDURES
Failure to follow this procedure may result in a nuisance smoke or odor
complaint.
The manifold pressure, gas rate by meter clocking, temperature rise and
operation must be checked after installation. Minor smoke and odor
may be present temporarily after start-up from the manufacturing
process. Some occupants are more sensitive to this minor smoke and
odor. It is recommended that doors and windows be open during the
first heat cycle.
General
1. Furnace must have a 115-v power supply properly connected and
grounded.
NOTE: Proper polarity must be maintained for 115-v wiring. Control
status indicator light flash rapidly (Status Code 10) and furnace does not
operate if polarity is incorrect or if the furnace is not grounded.
2. Thermostat wire connections at terminals R, W/W1, G, and Y/Y2
must be made at 24-v terminal block on furnace control.
3. Natural gas service pressure must not exceed 0.5 psig (14- in. w.c.,
350 Pa), but must be no less than 0.16 psig (4.5-in. w.c., 1125 Pa).
4. Blower door must be in place to complete 115-v electrical circuit
and supply power to the furnace components.
Before operating furnace, check flame rollout manual reset switch for
continuity. If necessary, press button to reset switch.
EAC-1 terminal is energized whenever blower operates. HUM terminal
is only energized when the blower is energized in heating.
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
3
0
9
2*
pipe equals 2.0 meters (6.5 ft.) of PVC/ABS pipe.
NOTICE
=
80 ft.
(24 M)
15 ft.
5 ft.
x
=
(4.6
(1.5 M)
M)
0 ft.
x
=
(0 M)
3.3 ft
30 ft.
x
=
(0.9 M)
(9 M)
40 ft.
20 ft.
x
=
(12.2
(6.1 M)
M)
165 ft.
(50 M)
95 ft.
(29 M)
NO
185 ft.
(57 M)
YES
UNIT OPERATION HAZARD
Failure to follow this caution may result in intermittent unit operation
or performance dissatisfaction.
These furnaces are equipped with a manual reset limit switch in the
burner assembly. This switch opens and shuts off power to the gas valve
if an overheat condition (flame rollout) occurs in the burner
assembly/enclosure.
Correct
improper gas pressure setting, improper burner or gas orifice
positioning, or improper venting condition before resetting switch. DO
NOT jumper this switch.
50
Use length of the longer of the vent
or air inlet piping system
Example from polypropylene vent
manufacturer's instructions, Verify from vent
manufacturer's instructions.
Add all of the above lines
For 2" pipe from
Table 13
Therefore, 60mm (2") pipe may NOT be used;
try 80mm (3")
For 3" pipe from
Table 13
Therefore, 80mm (3") pipe MAY be used
CAUTION
!
inadequate
combustion-air
supply,