Installation - Carrier 59SU5A Manual

Table of Contents

Advertisement

59SU5A: Installation, Start-up, Operating and Service Maintenance Instructions
!
Upflow installations utilizing the right side air return opening should
follow the Upflow Specific Steps - Offset Installation to ensure the full
opening is available for return ductwork.

INSTALLATION

Preparing the Furnace – Before Setting in Place
1. Remove appropriate knockout based off the installation orientation.
CAUTION
!
CUT HAZARD
Failure to follow this caution may result in personal injury.
Sheet metal parts may have sharp edges or burrs. Use care and wear
appropriate protective clothing, safety glasses and gloves when
handling parts, and servicing furnaces.
Fig. 12 – Knockout Removal
2. Remove two of the factory-installed drain plugs from collector box.
Orientation specific drain plugs (see
3. Check that all pre-installed gaskets on trap components are present,
adhered, and undamaged.
Remove these for Horizontal Left
Remove these for Horizontal Right
Fig. 13 – Drain Plugs
WARNING
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in property damage, personal
injury or death.
Missing or damaged gaskets on trap components may result in flue gas
leakage and water leakage.
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
NOTICE
Fig.
13).
Remove these for Upflow
Fig. 14 – Upflow Example of Trap Adapter Installation
L12F019B
Fig. 15 – Upflow Condensate Drain
A200075
Fig. 16 – Upflow - Offset of Condensate Drain
Upflow installations utilizing the right side air return opening should
follow the Upflow Specific Steps - Offset Installation to ensure the full
opening is available for return ductwork.
13
NOTICE
!
A200076
A200064
A200065

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents