Method 2; Method 3 - Daikin D2CND024A4AB Installation Manual

Wall-mounted condensing boiler
Hide thumbs Also See for D2CND024A4AB:
Table of Contents

Advertisement

E
D
F
B
A
1
2
3
4
6
a
Use a disconnector or a double check valve according to
local regulations.
After all system connections are performed with care, perform the
following steps:
1 Connect the appliance to the main power supply. Due to low
pressure, error code "Err HJ-09" will appear on the user
interface and the status indicator light will be red.
2 Open all radiator valves.
3 Set all isolating valves to closed position.
4 Connect fresh water supply pipe to valve 5.
5 Open valves 1, 2, 3, 4, 5, 6.
6 Slowly turn the valve 7 to open position until pressure reaches
a value around 0.8  bar for system heights up to 6  metres. For
longer system heights, see
requirements"  [ 4   11] to determine filling pressure. Filling
operation should be done slowly. When pressure exceeds
0.8  bar, error code will disappear and the status indicator light
will turn to blue. Turn the valve 7 off.
7 Turn the valve 5 off. Remove the filling loop if it is required by
local regulations.
8 Check the central heating circuit - especially the couplings of
the circuit - for leakage.
9 Make sure the automatic air vent valves located on the pump
and heat exchanger are opened. Vent the air from the
installation with the manual air vent screws on the radiators.
Make sure screws are tightened after venting.
10 If after the venting the pressure decreases below 0.8 bar, refill
with water until the pressure reaches 0.8 bar again.
11 Isolate the appliance from power mains.

Method 2

(For model D2CND024A4AB)
E
D
F
B
1
2
4
3
a
Use a disconnector or a double check valve according to
local regulations.
D2CND024A1/4AB + D2TND012~024A4AB
Wall-mounted condensing boiler
3P469346-3N – 2019.11
7
5
a
"4.5  Central heating system
A
5
7
8
a
6
After all system connections are performed with care, perform the
following steps:
1 Connect the appliance to the main power supply. Due to low
pressure, error code "Err HJ-09" will appear on the user
interface and the status indicator light will be red.
2 Open all radiator valves.
3 Set all isolating valves to closed position.
4 Connect the filling loop to the valve 7 and valve 8.
5 Set valves 1, 3, 5, 6 and 8 to open position.
6 Slowly open the valve 7 until pressure reaches a value around
0.8  bar for system heights up to 6  metres. For longer system
heights, see
"4.5 Central heating system
determine filling pressure. Filling operation should be done
slowly. When pressure exceeds 0.8  bar, error code will
disappear and the status indicator light will turn to blue. Turn
the valve 7 off.
7 You can monitor the system pressure value from the user
interface.
8 Make sure the automatic air vent valves located on the pump
and heat exchanger are opened. Vent the air from the
installation with the manual air vent screws on the radiators.
Make sure screws are tightened after venting.
9 If after the venting the pressure decreases below 0.8 bar, refill
with water until the pressure reaches 0.8 bar again.
10 Set valve 8 to off position. Remove the filling loop if it is
required by local regulations.
11 Check the central heating circuit - especially the couplings of
the circuit - for leakage.
12 Isolate the boiler from power mains.

Method 3

(For model D2CND024A1AB)
After all system connections are performed with care, perform the
following steps:
1 Connect the unit to the main power supply. Due to low
pressure, error code "Err HJ-09" will appear on the user
interface and the status indicator light will be red.
2 Open all radiator valves.
3 Set all isolating valves to vertical (open) position.
4 Measure system water height (see
requirements" [ 4  11]).
5 Slowly turn the filling valve until pressure reaches a value
around 0.8  bar for system heights up to 6  metre. For longer
system
heights,
see
requirements"  [ 4   11] to determine filling pressure. Filling
operation should be done slowly. When pressure exceeds
0.8  bar, error code will disappear and the status indicator light
will turn to blue. Turn off the filling valve.
6 System pressure value can be monitored from the user
interface.
7 Make sure the automatic air vent valves located on the pump
and heat exchanger are opened. Vent the air from the
installation with the manual air vent screws on the radiators.
Make sure screws are tightened after venting.
4 Installation
requirements" [ 4  11] to
"4.5 Central heating system
"4.5 
Central
heating
system
Installation manual
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D2cnd024a1abD2tnd012a4abD2tnd018a4abD2tnd024a4ab

Table of Contents