UTICA BOILERS SSC UBSSC-075 Installation Operation & Maintenance page 27

Wall mounted gas boiler
Table of Contents

Advertisement

FIGURE 6-10 Flue on Sidewall, Combustion Air on Roof
Combustion
FIGURE 6-11 Flue on Sidewall, Inside Combustion Air
Combustion
Air
Air
6 - COMBUSTION AIR AND VENT PIPING
Maintain 12"(305mm) US
(18"(457mm) Canada)
clearance above highest
anticipated snow level 24"
Air
(610mm) above roof
Vent
12" (305mm)
Anticipated
Snow Line
Ground Level
Vent
12" (305mm)
Anticipated
Snow Line
Ground Level
Confi gurations of single pipe vent with fl ue on the
sidewall, requires a tee as the vent terminal. See
fi gures 6-10 and 6-11.
27
NOTICE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents