5 - HYDRONIC PIPING
FIGURE 5-8B Multiple Boilers Using Primary/Secondary Pumping with Closed External Primary Loop
Heating Load
Heating Load
12"/305mm Maximum Separation
Heating Load
12"/305mm
Existing closely spaced tees
Maximum
in primary system loop
Separation
CH/System
Pump
System
Size common piping
Temperature
per maximum heat
Sensor
capacity of entire
system
Limit
length to
5' (1.6m)
All internal
primary loop
ball valves
closed
Up to 16
3/8"/10mm Open End
Wrench
boilers
19