Huawei SUN2000-75KTL Series User Manual page 65

Hide thumbs Also See for SUN2000-75KTL Series:
Table of Contents

Advertisement

SUN2000-(75KTL, 100KTL, 110KTL, 125KTL) Series
User Manual
● Sufficient slack should be provided in the PE cable to ensure that the last cable
● The cable outer diameter can be measured using the ruler sticker in the
● Ensure that the cable jacket is in the maintenance compartment.
● Ensure that the AC output power cable is secured. Failing to do so may cause
● Before closing the maintenance compartment door, check that the cables are
● If a screw on the maintenance compartment door is lost, obtain the spare
Figure 5-16 Multi-core cable connections
Issue 11 (2021-11-10)
NO TICE
bearing the force is the PE cable when the AC output power cable bears pulling
force due to force majeure.
maintenance compartment.
the solar inverter to malfunction or damage to its terminal block by issues such
as overheating.
connected correctly and securely, and clean up the foreign matter from the
maintenance compartment.
screw from the fitting bag tied at the bottom of the maintenance
compartment.
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
56

Advertisement

Table of Contents
loading

Table of Contents