SUN2000-(75KTL, 100KTL, 110KTL, 125KTL) Series
User Manual
Figure 7-16 Power adjustment parameters
Table 7-8 Power adjustment parameters
Parameter
Remote power schedule
Schedule instruction valid
duration (s)
Maximum active power (kW)
Issue 11 (2021-11-10)
Description
If this parameter is set to Enable, the inverter responds to the
scheduling instruction from the remote port. If this parameter
is set to Disable, the inverter does not respond to the
scheduling instruction from the remote port.
Specifies the time for maintaining the scheduling instruction.
When this parameter is set to 0, the scheduling instruction
takes effect permanently.
Specifies the output upper threshold for the maximum active
power to adapt to different market requirements.
Copyright © Huawei Technologies Co., Ltd.
7 Man-Machine Interactions
96