High Voltage Hookup
Service Panel Circuit Breaker(s) Sizing – based upon unit size, the specification page shows
appropriate service size requirements based on UL and NEC code.
Note: These two models require 120VAC source (not 240).
Source Power – route and install proper current carrying conductors as per local code requirements, from
service panel. Nameplate shows current and kW rating. Use copper wire only.
Safety Ground – copper wire is required, do not depend upon metal conduit.
12/30/2020
9
EI916