INSTALLATION MANUAL, PLENUM
INTENDED USE – This product is approved and label certified for water source heat pumps or
air handlers at the blower discharge, upflow only.
Drawings:
EH503
ES501
XX017
12/20/2017
EM-DI ** *5 *
kW
10 = 9.6 kW
15 = 14.4 kW
20 = 19.2 kW
Size
C = Plenum
16W x 16D
Stages
2 = 2
3 = 3
EI505

Advertisement

Table of Contents
loading

Summary of Contents for Electro Industries ELECTRO DUCT

  • Page 1 INSTALLATION MANUAL, PLENUM Size C = Plenum 16W x 16D EM-DI ** *5 * Stages 10 = 9.6 kW 2 = 2 15 = 14.4 kW 3 = 3 20 = 19.2 kW INTENDED USE – This product is approved and label certified for water source heat pumps or air handlers at the blower discharge, upflow only.
  • Page 2: Installation Requirements

    However, it can easily be adapted to other manufacturers (ClimateMaster, etc.) having a 16 x 16 starting collar. Electro Industries also has insert models (without starter plenum) primarily intended for Command-Aire or other water source heat pump brands. Contact factory for assistance.
  • Page 3: Specifications Table

    SPECIFICATIONS - TABLE 1 NOMINAL MIN. ELEMENT SOURCE INTERNAL SHIP MODEL CURRENT+ CFM* CROSS SECTION CB FUSE WEIGHT EM-DI1025C 9.6 1000 8 W x 16 D EM-DI1535C 14.4 1500 8 W x 16 D 75 30 & 50 19 EM-DI2035C 19.2 2000 8 W x 16 D 100 50 &...
  • Page 4 Heater Turn-On Action - The external application of 24 volts AC between "W1" and "C" pulls K2 relay which acts as a switch for the top 4.6KW element (E1). The red LED next to the "W1" terminal illuminates. A signal is also diode coupled to K1 and yellow LED illuminates. K1 provides an electrical path between "R"...
  • Page 5: Mechanical Installation

    MECHANICAL INSTALLATION The heat pump manufacturer's starter collar should be centered over the discharge blower. Generally the blower shaft is 9Ø to the facing front of this Electro-Duct. In other words, if you would be viewing the blower motor shaft, you would see the side of the electrical control box. Also blower centering means, the approximate 3 inch opening of the blower discharge is centered under the electric elements.
  • Page 6 OPERATIONAL MONITOR LIGHTS Green - 24 volt at "R", reference to "C". Amber - Internal blower relay is pulled based upon an input on either "W1", "X", or "W2". Red (opposite stat terminal) - 24 volts (reference to "C") is at the terminal next to the red light.
  • Page 10 TWENTY YEAR (20) LIMITED WARRANTY ON SPIN FIN ELEMENTS Electro Industries, Inc. warrants that the spin fin elements of its products are free from defects in materials and workmanship through the twentieth year following date of installation. If any spin fin elements are found to have a manufacturing defect in materials or workmanship, Electro Industries will replace them.
  • Page 11 ALL IMPLIED WARRANTIES, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, ARE HEREBY DISCLAIMED WITH RESPECT TO ALL PURCHASERS OR OWNERS. ELECTRO INDUSTRIES, INC. IS NOT BOUND BY PROMISES MADE BY OTHERS BEYOND THE TERMS OF THESE WARRANTIES. FAILURE TO RETURN THE WARRANTY CARD SHALL HAVE NO EFFECT ON THE DISCLAIMER OF THESE IMPLIED WARRANTIES.