Flush Channel Installation Guide

Flush Channel Installation Sequence

Before installing the Node Channel, ensure whenever possible, there is access to both sides.
The Node Flush Channel assembly consists of two mounting angles held together by intermittent mounting brackets
which interfaces with the Channel Face
10.63
270
MOUNTING WIDTH
Suspend the mounting angles and mounting brackets at the required level.
Fix suspension hangers to the mounting angles using the slots provided in the mounting angles.
It is recommended that the Node Flush Channel is supported no more than 150mm [6"] from an end or 150mm [6"]
from any joint.
10.63
270
MOUNTING WIDTH

Access Cables

Once the mounting assembly is installed, attached the Node access cables to the bridging plate in the mounting
assembly through the hole provided.
Before connecting the channel face to the mounting assembly, connect the other end of the Node access cable to the
flange on the inside of the channel face in the hole provided.
When lowering the channel onto access cable, the face should be lowered gently to avoid damage, ensuring that there
is no-one standing below.
v001 | Flush Channel Installation Guide
56.06
1424
Flush Channel with Soft Cell Panel
5.91
MOUNTING SLOT SPACING
150
Flush Channel with Soft Cell Panel
Flush Channel with Weave Panel
56.06
1424
Flush Channel with Weave Panel
Flush Channel with Soft Cell Panel
Figure 2
5.91
MOUNTING SLOT SPACING
150
Flush Channel with Weave Panel
Figure 3
118.11
3000
MAX LENGTH
MOUNTING ANGLE
118.11
3000
MAX LENGTH
35.43
900
MAX RECOMMENDED
SUPPORT SPACING
MOUNTING BRACKET
118.11
3000
MAX LENGTH
MOUNTING ANGLE
118.11
3000
MAX LENGTH
35.43
900
MAX RECOMMENDED
SUPPORT SPACING
MOUNTING BRACKET
BRIDGING PLATE
ACCESS CABLES
MOUNTING ANGLE
MOUNTING ANGLE
4