Software; Installation - Busch-Jaeger 6136/30M Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

9

Software

9.1

Installation

ETS
1. Install the panel commissioning software from the current EIB database on a PC.
(from V.
2. Import the product database into the ETS.
1.3)
3. Configure the unit and set the parameters.
Power-
1. Install the panel commissioning software from the current EIB database or from the
Projekt 4.x
Power-Projekt CD.
2. Configure the unit and set the parameters (see above).
The EIB database can be purchased directly from Busch-Jaeger or downloaded from the
Internet at www.busch-jaeger.de.
ENG
43

Advertisement

Chapters

Table of Contents
loading

Table of Contents