Kohler K-45764T Installation Instructions Manual

Kohler K-45764T Installation Instructions Manual

Bathroom cabinets

Advertisement

Quick Links

BEFORE YOU BEGIN

BEFORE YOU BEGIN
·
Please read these instructions carefully to familiarize
yourself with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will help you avoid costly
mistakes. In addition to proper installation, read all
operating and safety instructions.
·
All information in these instructions is based upon the
latest product information available at the time of
publication. Kohler China. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
·
These instructions contain important care, cleaning, and
warranty information-
consumer.
·
ALEUTIAN/FOREFRONT bathroom cabinet adopts E1
grade wood-based panel of high quality, and with further
processing, its harmful emissions will be less than
1.5mg/L.
·
Turn off the water supply.
·
The plumbing installation must comply with Water Supply
Regulations/Bye-laws, Building Regulations or any
particular regulations and practices, specified by the local
water company or water undertakers. The installation
should be carried out by a plumber.
·
Before installation carefully inspect the new fixture for any
signs of damage.

ORDERING INFORMATION

This installation covers the following products in the
ALEUTIAN
/FOREFRONT
ALEUTIAN 900mm Bathroom Cabinet............K-45764T-0
FOREFRONT
900mm Bathroom Cabinet..........................
.....................................................K-45764T-E63/C38/C36

SAFETY: WARNINGS

Kohler products are precision-engineered and should give
continued superior and safe performance, provided:
1. They are installed, commissioned, operated and
maintained in accordance with the recommendations given
in this Manual.
2. Periodic attention is given, as necessary, to maintain the
product in good functional order. Recommended guidelines
are given in the
MAINTENANCE
Carefully inspect the new fixture for any signs of damage.
When installing Kohler Products, manufacturers guidelines for
power tool safety should be followed.
1204965-T01-D
please leave instructions for the
range:
section.
·
·
·
·
/
·
·
·
900mm
900mm
....................................................K-45764T-E63/C38/C36
1.
2.
215500
-1-
ALEUTIAN
FOREFRONT
Installation INSTRUCTIONS
BATHROOM CABINETS
E1
1.5mg/L
/
......................................K-45764T-0
.............................................................
Copyright Kohler China Ltd., 2013
K-45764T
-
, 2013

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the K-45764T and is the answer not in the manual?

Questions and answers

Summary of Contents for Kohler K-45764T

  • Page 1 · · All information in these instructions is based upon the latest product information available at the time of publication. Kohler China. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. ·...
  • Page 2 ROUGHING-IN Reference Value UNIT : mm Fig.1 Kohler reserves the right to change marked dimensions without prior notice. INSTALLATION A. Install Washbasin Cabinet Install the services. Hot (H) and Cold (C) inlets must be connected to the correct inlet pipes.
  • Page 3 1. Mark the position of hanged bracket according to dimensions as illustrated, and loosen the suspension hook of washbasin cabinet. Caution! Avoid the cables and pipes inner set when drilling in the wall. Note: Different types of bolts are required for different decoration boards.
  • Page 4 4. Hang the washbasin cabinet on the wall, and position the suspension on the hanged bracket. 5. Set the washbasin cabinet onto the wall bracket. Be sure the cabinet adjusted level and the back board of cabinet appressed to the wall by adjusting the screws of wall clips. Fig.5 6.
  • Page 5 Install the Synthetic Top Note: Please refer to the installation instructions of synthetic top for its installation. To protect the cabinet from dampness, please apply silicone sealant where the synthetic top and the cabinet connect. Connect Drainage 1. Inwall drainage (P-Trap) Please install the drain assembly and faucet as shown.
  • Page 6 6. Please do not sit, lean or step on the basin cabinet. 7. If any fixtures caused by abnormal reasons, Kohler China can supply paid replacement for service parts caused by abnormal reasons as shown in the Service Parts Page in the limited duration of warranty.

Table of Contents