TABLE OF CONTENTS Safety warnings Product Introduction Technical characteristics Preliminary Checks Installing the Product Installing Release Adjustment of rod angle Inversion of direction of opening Balancing Testing and commissioning Testing Commissioning Instructions and warnings for...
Read the instructions carefully before proceeding with installation. contact a Key Automation Service Centre. Use of the automation system in these conditions may cause hazards; The design and manufacture of the devices making up the...
4 - PRODUCT INSTALLATION 4.1 - Installation opening barrier. Before proceeding with the installation, check the integrity of the product and that all components are present in the package. 4. Wait for the complete setting of the concrete. 1. Provide a foundation pit and arrange one or more conduits for the passage of the electrical cabling (Fig.
5- TESTING AND COMMISSIONING THE AUTOMATION cians who must perform the tests required by relevant legislation testing methods for the automation of doors and gates. related to risks, ensuring compliance with the provisions of the 5.1 Testing All system components must be tested following the procedures Check the correct operation of all connected devices (photocells, sensitive edges, emergency buttons, etc.), testing the opening, outlined in the respective instruction manuals.
Page 8
Fig. 2 Typical Installation Fig. 3 Preparing the base Fig. 4 IT - Fissaggio barriera FR - Fixation barrière EN - Fixing the barrier body PT - Fixação barreira Mocowanie korpusu bariery DE - Die Festsetzung der Sperrkörper PL - ES - Fijación barrera ALT4 ALT6...
Page 9
Fig. 5 Release Fig. 6 Adjustment of rod angle Fig. 7 Inversion of direction of opening and balancing ALT4 ALT6...
Page 10
Key Automation S.r.l. Via A. Volta 30 - 30020 Noventa di Piave (VE) T. +39 0421.307.456 - F. +39 0421.656.98 Instruction version info@keyautomation.it - www.keyautomation.it 580ISBR rev.03 Instruction version 580ISBR rev.01...