Adding or Replacing a SCSI Card
There are static-sensitive electronics inside the unit. Before you handle any
Caution
parts, make sure you are working at a static-controlled workstation and that you are
properly grounded.
Shutting Down the Server
Shut down the server before you make any repairs. Improper shutdown may
Caution
lead to physical harm or loss of data.
To start the shutdown process, push the power
1
button on the front of the server.
The system LED blinks 3 times per second and
the green power LED remains lit until the
shutdown process is complete. Do not
disconnect the AC power cord while the power
LED remains lit.
After the power LED is off, disconnect the AC
2
power cord and all other cables from the back
of the server.
If the server is rack-mounted, remove it from the rack to a clean surface with
3
ample room to the front and rear.
Field Service Documentation
Copyright © 2009, Overland Storage, Inc. All rights reserved. Information in this document is subject to change without notice and does
not represent a commitment on the part of Overland Storage or any of its subsidiaries.
Snap Server 410
Power
1
Need help?
Do you have a question about the Snap Server 410 and is the answer not in the manual?
Questions and answers