Download Print this page

After Installation - Lakes Bathrooms Curved Corner Instructions

Advertisement

RAISED INSTALLATION
7
Turn tray over & fit waste. Place in position, edges upto &
parallel to walls.
Adjust legs at rim & level tray in both directions; maintain
100mm nominal panel gap & ensure ALL legs are in firm
contact with floor & tray underside. After levelling, bond
legs to floor with silicone sealant or 'No Nails' type
adhesive.
9
Seal tray edges to walls with anti fungal silicone sealant
& allow to cure.
11
Remove the protective cover from the adhesive tape.
Fix the panel pushing it firmly on to the adhesive pads.
4
8
When shower tray is set remove the remainder of the
protective plastic film and connect the waste pipe and
check for leakage and water drainage.
10
Tile & seal tray edges to walls with anti fungal silicone
sealant & allow to cure.

After Installation

4 - 4
D

Advertisement

loading