LINDR 022-2021 Instruction Manual

Flow-through cooler

Advertisement

Quick Links

INSTRUCTION MANUAL
FLOW-THROUGH COOLER
LINDR
ENGLISH
Number 022-2021 REV00
Valid 2021-02-01
AS-40
GLYKOL
GREEN LINE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 022-2021 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for LINDR 022-2021

  • Page 1 INSTRUCTION MANUAL FLOW-THROUGH COOLER LINDR ENGLISH Number 022-2021 REV00 Valid 2021-02-01 AS-40 GLYKOL GREEN LINE...
  • Page 2 Sadová 132 503 15 Nechanice, Czech Republic mob.: + 420 775 715 494 tel. : +420 495 447 239 e-mail: info@lindr.cz web: www.lindr.cz, www.lindr.eu SYMBOLS AND MARKINGS USED IN THE MANUAL: WARNING: NOTE: Not following instructions may cause injury or his symbol indicates information and re- damage the device.
  • Page 3: Table Of Contents

    Contents: Introduction ........Description of the cooler ........Machine plate .
  • Page 4: Introduction

    -6 ° C. The cooling unit is equipped with a powerful pump WARNING: Cleaning and maintenance of with a displacement of 6 m. The modern Lindr the appliance by the user must not be done by cooling technology uses the input energy for unsupervised children.
  • Page 5: Installation And Placement

    WARNING: When unplugging the device • Ensure sufficient free space for air circulation from the socket, grab the plug and pull it out. and heat dissipation. Do not under any circumstances pull at the • Ensure sufficient supply of fresh air. cable;...
  • Page 6: Testing

    7. TESTING: outside of the territory of the Czech Republic is governed by the agreement between the The product is delivered ready for immediate retailer and the buyer in their mutual relation- use. ship; this agreement is not directly linked to the 8.
  • Page 7: Filling The Cooler Tank And Connection With Beer Tank

    10. PLASTIC TANK FILLING AND CONNECTION WITH BEER TANKS: figure figure Pour liquid here figure...
  • Page 8: Putting Into Operation

    11. PUTTING INTO OPERATION: 1. Fill the plastic tank with liquid (antifreeze based on monopropylene glycol) up to the over- flow. NOTE: For connection use only the fittings and clamps specified by the supplier. Use ca- librated hoses. 2. Connect the cooling machine to the tank, see Fig. 7C (diagram of the connection of the coo- ler to the tank).
  • Page 9: Inspection Before Every Use

    13. THERMOSTAT STC 200, Dixell XR20CX: figure figure Displaying Set Temperature: 1. Short-press the SET button. The display will show the set value. 2. To return the display to the current temperature, again short-press the SET button or wait Changing Set Temperature: 1.
  • Page 10: Maintenance

    16. MAINTENANCE: The condenser must be checked for cleanliness every month. Any dirt found must be cleaned with compressed air or wiped off. Otherwise, there is a risk of reduced cooling output or damaging of the cooler. Wipe the device only with a soft and, if needed, lightly moistened cloth. 17.
  • Page 11: Spare Parts

    NOTE: If the defect persists even after the above steps are taken, contact a service centre. Do not forget to specify the following: • type of defect • type of product • production year • product‘s serial number (found on the plate) Ordering Components: ALWAYS USE ORIGINAL COMPONENTS.

Table of Contents