Download Print this page
Campbell Hausfeld IN730600AV Easy Setup Manual
Campbell Hausfeld IN730600AV Easy Setup Manual

Campbell Hausfeld IN730600AV Easy Setup Manual

Campbell hausfeld 3/8 inch stapler easy setup guide

Advertisement

Quick Links

3/8 inch Stapler
CHN71600
3
Load
fasteners. See manual for further information regarding
length and type of fasteners.
Press magazine latch button
Press
magazine latch button
and pull magazine open.
and pull magazine open.
Setup
Like a Pro
Visit us at
chpower.com
Setup
Like a Pro
Easy Setup Guide
Projects are easier with
Campbell Hausfeld products.
Thank you for deciding to purchase a Campbell
Hausfeld product. We are dedicated to providing
tools that help you to complete your projects
Like a Pro.
© 2010 Campbell Hausfeld/Scott Fetzer
Load
staples into the
magazine as shown.
1
Close
regulator,
compressor and
Allow
maximum pressure.
NOTICE: To operate this tool you will need
at least a 1 gallon compressor.
IN730600AV 2/10
Close
magazine.
2
pressure
Attach
Turn ON
to regulator outlet.
Adjust
tank to reach
knob so outlet
pressure is between
60 psi and 100 psi.
4
Attach
airhose to nailer inlet.
CHN71600 — Air Powered Stapler
air hose
regulator
100
60
psi
psi
coupler on

Advertisement

loading

Summary of Contents for Campbell Hausfeld IN730600AV

  • Page 1 Setup Like a Pro Visit us at chpower.com Like a Pro © 2010 Campbell Hausfeld/Scott Fetzer IN730600AV 2/10 Load staples into the Close magazine. magazine as shown. Close pressure...
  • Page 2 Guide d’installation facile Les projets sont plus faciles avec les produits Campbell Hausfeld. Merci d’avoir décidé d’acheter un produit Campbell Hausfeld. Nous sommes engagés à fournir des outils pour vous aider à terminer vos projets Comme un Professionnel. Ármela profesional Guía de armado fácil...

This manual is also suitable for:

Chn71600