OPERATING PROCEDURE
13. Removing the receiver
Note 1: Recover refrigerant without spreading it in the air.
14. Removing the reactor (ACL1, ACL2, ACL3) (Y model only)
Note 1: Pay extra attention when handling the reactor
since it is very heavy (4.1 kg).
OCH651
All manuals and user guides at all-guides.com
Photo 13
Photo 14
PHOTOS