Installation MG-3/IR Express Lavatory ® System - MG Series with Adaptive Infrared Control Table of Contents Pre-Installation Information ....2 Dimensions........3 Supplies Required .
Page 2
1,000 lbs. Overtightening fasteners can damage the Terreon material. Use caution when tightening bowl and ® sprayhead fasteners. Product warranties may be found under “Product Information” on our web site at www.bradleycorp.com. Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
1/2" nominal copper tubing for hot and cold supplies and 1½" NPT drain piping • 110 volt electrical outlet for 110/24 VAC plug-in transformer (supplied) • 240/208 volt or 277 volt electrical outlet for optional electrical tankless water heater Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
34" above finished floor to be compliant with Americans with Disabilities Act (ADA). When mounted at 33½" rim height, the MG-3/IR Express meets ADA, ANSI and UFAS requirements for barrier-free clearances, reaches and ® controls. Always check local codes and ordinances for compliance. Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
Page 5
Do not overtighten. If necessary, adjust sprayhead body to fit closely to the wall by adjusting the sprayhead mounting bolts. Refer to the components illustration for bolt locations. Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
Page 6
Slide the valve bracket up and lift it from the frame. Connect one end of flexible hose to the tempered line adapter. Connect the other swivel end to the stop. Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
Page 7
Connect the ½" flexible hose from the hot water heater from the cold water supply outlet to the supply inlet on stub-out to the hot water the solenoid valve assembly. heater inlet. Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
Page 8
Loosen the compression nuts. Push the sprayhead supply tubes firmly into the tube connectors until they are fully seated. Tighten the compression nuts by hand. Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
Page 9
(while not in use) to adapt to the bowl if another object is detected during the two-minute start-up period. Check the temperature when approximately 1.0 GPM water flow is reached and adjust if necessary (the range of the valve is 95°F–125°F (35°C–52°C). Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
Avoid contact with hot pans and objects. Repair Kits: Terreon repair kits are available. Contact your Bradley representative or distributor for part numbers and pricing ® Repair kits are made to order and have a shelf life of 30 days.
Page 13
2. Inspect the stop valves for proper installation. 3. Inspect mixing valve for proper hot and cold installation. A red marking indicates the hot inlet. Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
Page 14
• reconnect to the adjacent valve and turn on the water supplies to the unit; • pass your hand in front of the sensor. If the station still fails to turn on, replace the sensor. Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
198-014 Check Valve* 132-051 Retaining Ring* 118-319 Valve Body 146-079 U-Clip * Included with Prepack S65-326 Tempered Line Adapter Option Part no. S39-804 (replaces S59-4000 if tempered line is used) Strainer (173-028) Bradley • 215-1322 Rev. W; ECN 13-08-025 4/9/2014...
Need help?
Do you have a question about the MG Series and is the answer not in the manual?
Questions and answers