Setting Up - VERDER CARBOLITE GERO E Series Installation, Operation And Maintenance Instructions

1200 c tube furnaces
Table of Contents

Advertisement

If the product is to be used in a process which could liberate hazardous gases, then it
should be installed together with a suitable fume extraction system.
Ensure that the product is placed in such a way that it can be quickly switched off or
disconnected from the electrical supply.
2.3

Setting Up

The horizontal furnace models must have a work tube fitted before being used. The
diameter of the work tube is a customer order option and therefore varies between
tube furnaces.
Note: If a metal work tube is being used in the furnace, ensure that it is
earthed. See 5.4.
Under no circumstances should any objects be placed on top of the product.
Always ensure that any vents on the top of the product are clear of any
obstruction. Always ensure all cooling vents and cooling fans (if fitted) are
clear of any obstruction.
Fitting the standard length work tube in a split tube furnace
No tools required.
2.0   Installation
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Carbolite gero est 12/150b

Table of Contents