VERDER CARBOLITE GERO E Series Installation, Operation And Maintenance Instructions page 35

1200 c tube furnaces
Table of Contents

Advertisement

Seals (if fitted)
Performance
Element Circuit
Power Consumption
Cooling Fans (if fitted)
rect positioning
Check all seals and O-rings and clamps
Electrical measurement
Measure the current drawn on each
phase / circuit
Check whether the cooling fans are work-
ing
6.0   Maintenance
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Carbolite gero est 12/150b

Table of Contents