Download Print this page

V-fit-ST HERCULEAN STB09-4 Assembly & User Manual page 15

Folding weight bench
Hide thumbs Also See for HERCULEAN STB09-4:

Advertisement

Note
Do not fully tighten at this stage.
Assembly Accessories 1
PART No. DESCRIPTION . . . . . . . . . . . . . . QTY
17
M8 x 50mm CARRIAGE BOLTS . . . . . .
19
M8 x 85mm CARRIAGE BOLTS . . . . . .
23
M8 FLAT WASHERS . . . . . . . . . . . . . .
26
M8 NYLON LOCKNUTS . . . . . . . . . . . .
30
BARBELL LOCKING PINS . . . . . . . . . . .
Note
Do NOT FULLY TIGHTEN any
Bolts, Nuts or Fittings at this
stage unless specifically
instructed to do so.
1
Connect both Uprights (2) to the Upright Support Bar (3) using 4 x M8 x 50mm
Carriage Bolts (17) fitted from the inside as per illustration, 4 x M8 Flat Washers (23)
and 4 x M8 Nylon Locknuts (26).
Place both Uprights (2) on the outside of the Rear Stabiliser (1) and secure in place using 2 x
M8 x 85mm Carriage Bolts (19) fitted from the outside, 2 x M8 Flat Washers (23)
and 2 x M8 Nylon Locknuts (26).
Now attach both Stabiliser Brackets (13) to the inside of both Uprights (2) using 2 x M8 x
50mm Carriage Bolts (17), 2 x M8 Flat Washers (23) and 2 x M8 Nylon Locknuts (26),
and in between the Rear Stabiliser (1) and Squat Stand Tubes (52) using 2 x M8 x 85mm
Carriage Bolts (19), 2 x M8 Flat Washers (23) and 2 x M8 Nylon Loknuts (26).
Connect the Squat Stand Link Plates (54) to the INSIDE of each Upright and Squat Stand Tube
Using 4 x M8 x 50mm Carriage Bolt (17), 4 x M8 Flat Washer (23) and 4 x M8 Nylon Locknut
(26) for each fitting. Now fit the Barbell Locking Pins (30) through the holes in the top of both
Uprights (2) as shown below.
10
4
14
14
2
Assembly
Page 15

Hide quick links:

Advertisement

loading