Siemens SIMOTICS FD 1LH1 Operating Instructions & Installation Instructions page 7

Low-voltage motor
Hide thumbs Also See for SIMOTICS FD 1LH1:
Table of Contents

Advertisement

5.4.4
5.4.5
Axial and radial forces............................................................................................................69
5.5
Connecting the cooling water supply .....................................................................................70
6
Electrical connection...................................................................................................................................73
6.1
Safety instructions for the electrical connection .....................................................................73
6.2
Basic rules..............................................................................................................................73
6.3
Terminal box ..........................................................................................................................74
6.3.1
Terminal box GT640 ..............................................................................................................74
6.3.2
Terminal box 1XB1621...........................................................................................................75
6.3.3
Terminal box 1XB1631...........................................................................................................76
6.3.4
Terminal box 1XB7730...........................................................................................................77
6.3.5
Terminal box 1XB7731...........................................................................................................77
6.3.6
Terminal box 1XB7740...........................................................................................................78
6.3.7
Terminal box 1XB7750...........................................................................................................79
6.3.8
Rotating the terminal box .......................................................................................................79
6.3.9
Mounting/removing the terminal box ......................................................................................82
6.4
Preparation.............................................................................................................................83
6.4.1
Terminal designation..............................................................................................................83
6.4.2
Selecting cables .....................................................................................................................83
6.4.3
Connecting the grounding conductor .....................................................................................83
6.4.4
Connection without terminal box ............................................................................................85
6.4.5
Connecting the machine for a specific direction of rotation....................................................85
6.4.6
Undrilled entry plate ...............................................................................................................86
6.5
Inserting and routing the cables .............................................................................................86
6.5.1
Bringing cables into the terminal box GT640 with cable gland ..............................................86
6.5.2
Bringing cables into the terminal box 1XB... with sealing insert with break-off ring ...............87
6.5.3
Bringing cables into the terminal box 1XB... with cable gland................................................88
6.5.4
Laying cables .........................................................................................................................89
6.5.5
Connecting cables with cable lugs .........................................................................................89
6.5.6
Connecting cables without cable lugs ....................................................................................90
6.5.7
Use of aluminum conductors..................................................................................................92
6.5.8
Using single-stranded cables .................................................................................................92
6.5.9
Internal equipotential bonding ................................................................................................92
6.5.10
Stepless mating face for the seal in the terminal box cover ..................................................93
6.5.11
Minimum air clearances .........................................................................................................93
6.5.12
Finishing connection work......................................................................................................94
6.6
Connecting the auxiliary circuits.............................................................................................94
6.6.1
Selecting cables .....................................................................................................................94
6.6.2
Bringing cables into the auxiliary terminal box and routing them ...........................................95
6.6.3
Connecting temperature monitoring for the stator winding ....................................................95
6.6.4
Terminating the connection work (auxiliary circuit) ................................................................96
7
Start-up.......................................................................................................................................................97
7.1
Checks to be carried out prior to commissioning ..................................................................97
7.2
Converter operation ...............................................................................................................99
7.3
Measuring the insulation resistance before commissioning...................................................99
7.4
Greasing the roller bearings prior to commissioning............................................................100
SIMOTICS FD 1LH1
Operating Instructions 01/2019
Table of contents
7

Advertisement

Table of Contents
loading

Table of Contents