  • Page 1 Operation and maintenance manual for the KSM series boilers with feeders...
  • Page 2: Table Of Contents

    Thank you for purchasing PEREKO heating boiler. This documen- Manual for the controller, which should be read and understood, tation applies to the KSM series boilers with automatic fuel feeder. is enclosed in the set of documents for the boiler supported by The manual contains all necessary information and recommen- electronics.
  • Page 3: Introduction

    Approximate boiler power can be calculated using a power cal- efficiency, which can be reached during continuous use and culator on our website www.pereko.pl Furthermore, you should maintaining the efficiency declared by the producer) should be also consider: thickness of walls and insulation, the thermal...
  • Page 4: Technical Description Of The Ksm Boilers

    2. TECHNICAL DESCRIPTION OF THE KSM BOILERS 2.1. Intended use Steel heating boilers KSM are intended for installation in the systems or in open systems with forced circulation, which are central heating water systems in single-family houses, garag- equipped with protections in compliance with the requirements es, maintenance rooms etc.
  • Page 5 2.2.6. Electronic controller 2.2.8. Water connections Microprocessor controller, installed in upper front part of the Water connections are intended for connection of boiler to the boiler allows programming temperature of boiler operation central heating system. Size of supply and return connection and programming changes of temperature of its operation at - G 1 ½”...
  • Page 6: Boiler Design Diagram

    2.3. Boiler design diagram 1. Water casing 5. Thermal insulation panels 2. Ash-pan doors 6. Electronic controller 3. Cleaning doors 7. Set of feeder with burner 4. Water jacket 8. Water connections * boiler height does not include levelling legs. Page Operation and maintenance manual for the KSM series boilers with feeders.
  • Page 7 9. Flue with a damper 13. Ash-pan cleaning hole 10. Flue gas swirlers 14. Smoke tubes cleaning hole 11. Charging hopper 12. Ash-pan drawer * boiler height does not include levelling legs. Operation and maintenance manual for the KSM series boilers with feeders. The producer reserves the right to introduce technical modifications. Page...
  • Page 8 Page Operation and maintenance manual for the KSM series boilers with feeders. The producer reserves the right to introduce technical modifications.
  • Page 9: Operation And Technical Parameters

    2.4. Operation and technical parameters Boiler model Parameter Unit [mm] ∅ 159 ∅ 178 [mm] 340 × 290 340 x 190 [mm] [mm] [mm] [mm] 1200 1250 1530 Dimensions [mm] 1230 [mm] [mm] 1035 1320 [mm] 1275 [mm] [mm] Primary fuel — eco-pea coal Thermal power range* [kW]...
  • Page 10: Fuel

    2.5. Fuel Fuel used for combustion in the KSM boiler should have suf- and formation of large amounts of dust and soot and increased ficient calorific value > 28 MJ/kg, be dry (moisture content fuel consumption. Boiler burn time depends on many factors: <...
  • Page 11: Boiler Setting

    3.2. Boiler setting The boiler requires non-flammable flooring, in form of a foun- • the distance of rear part of the boiler from the wall of the dation, but it is allowed to place it on non-flammable wall base boiler room should be equal to at least length of the con- with height not lower than 50 mm.
  • Page 12: Connection To Chimney

    The connector should be directed slightly up- www.pereko.pl Regardless of the results of the calculations wards from 5° to 20°. If boiler flue will have a length over the minimum intersection of masonry chimney should not 400 mm then it is recommended to insulate it with a thermal be lower than 14 ×...
  • Page 13 Exemplary diagram of the open central heating system with four-way valve and hot water heater Operation and maintenance manual for the KSM series boilers with feeders. The producer reserves the right to introduce technical modifications. Page...
  • Page 14: Connection Of The Boiler To Electrical System

    3.4.2. Closed water installations 3.4.3. Four-way valve PEREKO heating boilers fired with solid fuels and with automatic Design of the heating system should take into account protec- fuel charging with nominal power up to 300 kW can be used in...
  • Page 15: Filling The System With Water

    3.6. Filling the system with water 3.6.1. Filling the boiler with water 3.6.2. Refilling the system with water before first start-up Heating system with open container allows direct contact of 1. Flush heating system and boiler before filling it with water to heating water with the air what results in evaporation and ne- remove all contaminations.
  • Page 16: Service Manual

    4. SERVICE MANUAL 4.1. Safe operating conditions To maintain safe operating conditions for the boiler you should: and take special care during servicing of non-insulated com- • Execute heating system correctly in compliance with the ponents (e.g. doors), which may heat up to high tempera- requirements of the standards: PN 91/B-02413, applying to tures resulting in risk of burn injuries.
  • Page 17: Firing Up In The Ksm Series Boilers

    4.3. Firing up in the KSM series boilers solid fuels leads to accelerated wear and tear of the boiler 1. Fill the fuel container with eco-pea (hard) coal of sufficient and decreases its efficiency. quality. 2. The close tightly flap of the container (hopper). The above parameters may require individual adjustment 3.
  • Page 18: Approximate Output Parameters Of The Controller

    4.4. Approximate output parameters of the controller The controller is pre-configured, but its output parameters are of pellet or depending on the development of the heating sys- changed, depending on fuel used (calorific value) and may re- tem. Selecting correct parameters ensures economical combus- quire individual adjustment.
  • Page 19: Emergency Stop Of Boiler Operation

    57°C (symptoms similar to leak) Leak to be assessed by the producer repair by PEREKO service Too high chimney’s draught — adjust chimney draught with a damper in boiler flue Fuel suspends in the...
  • Page 20: Warranty Terms And Conditions

    1. Envo sp. z o.o. with registered office in Starachowice ul. Ra- 9. The warranty is prolonged by a period from the date of the no- domska 76 is a producer of PEREKO boilers. tice of boiler repair to the date of its execution. Execution of the 2.
  • Page 21 The beginning of the warranty period for the PEREKO boiler is the date of purchase confirmed by a proof of purchase. Operation and maintenance manual for the KSM series boilers with feeders. The producer reserves the right to introduce technical modifications.
  • Page 22 SERVICE ASSISTANCE Date Comments Signature Page Operation and maintenance manual for the KSM series boilers with feeders. The producer reserves the right to introduce technical modifications.
  • Page 23 Guarantee for tightness of welding connections of water casing in the boiler is provided for 10 years, 72 months for tightness of the heat exchanger and 24 months for the other components. The beginning of the warranty period for the PEREKO boiler is the date of purchase confirmed by a proof of purchase.
  • Page 24 Producer: Envo sp. z o.o., 27-200 Starachowice, ul. Radomska 76, POLAND www.grupaenvo.pl Technical support tel. +48 (41) 274 53 53, fax +48 (41) 274 53 26 e-mail: serwis@pereko.pl, mobile +48 602 315 512, 604 953 459, 660 726 577 www.pereko.pl...
  • Page 25 Boiler regulator ecoMAX 910R1 FOR SOLID FUEL BOILERS A, B, C – functions chich are available in module, respectively: A, B, C * room panel ecoSTER200/ecoSTER TOUCH (module B, C and ecoSTER200 are not part of standard equipment) SERVICE AND ASSEMBLY MANUAL ISSUE: 1.2 SOFTWAREE: MODULE...
  • Page 27 PRINCIPLES USAGE Individual Fuzzy Logic CONTROLLED BOILER: The regulator must be programmed individually for the given type of boiler and fuel. It is inadmissible to change the type of gear-motor, fan, and to make other changes in the boiler fittings which can influence the burning process.
  • Page 28 TABLE OF CONTENTS Safety requirements ............5 18.3 ........... 43 REVENTIVE COOLING DOWN General information ............6 18.4 ......43 ROTECTION OF PUMPS AGAINST LOCKING Information about documentation ........6 18.5 ............43 EEDER PROTECTION Storage of documentation ..........6 19 REPLACEMENT OF PARTS AND COMPONENTS ....
  • Page 29: Safety Requirements

    The regulator must be installed by a Safety requirements boiler manufacturer accordance with the applicable safety standards. Requirements concerning safety are The programmed parameters should described in detail in individual chapters of only altered person this manual. Apart from them, the following familiarized with this manual.
  • Page 30: General Information

    significant for safety issues, hence the user General information should read both parts of the manual. Boiler regulator ecoMAX910R1, is a modern We are not responsible for any damages electronic device intended to control pellet caused failure observe these boiler operation.
  • Page 31 REGULATOR INSTRUCTION MANUAL ecoMAX 910R1...
  • Page 32: Operating The Regulator

    Operating the regulator - Preset boiler temperature decrease due to activated time spans; The regulator turns on by pressing the knob. To start the use of boiler, fire up the boiler –Boiler preset temperature during using the FIRING UP operation mode, then loading the domestic hot water tank (DHW);...
  • Page 33: Setting The Preset Boiler Temperature

    Setting preset boiler fuel supplied, and feed next fuel dose, if temperature required. Set the preset boiler temperature in: MENU Boiler settings Preset boiler temperature Note: Preset boiler temperature will be automatically increased to enable filling HUW container and heating circuits of mixers, if required.
  • Page 34: Operation-Fuzzy Logic Mode

    is not available for regulators, which are Once the preset boiler temperature has been provided with STANDARD mode of operation achieved, the regulator automatically enters only. SUPERVISION mode. In Standard mode the regulator operates in OPERATION–Fuzzy Logic mode automatic cycle with parameters preset by Upon change of boiler regulation mode from the user.
  • Page 35: Supervision

    In case the regulator works in SUMMER The fan does not work continuously, and is mode of operation or with a little heat switched on along with the fuel feeder demand (in Spring and Autumn), modulation periodically, which prevents fire damping in of boiler output is not justified.
  • Page 36: Huw Settings

    set in: MENU Boiler Settings Burner hot utility water. Settings . 7.10 HUW settings The equipment controls the temperature of Once a week on Sunday at 2:00 A.M the HUW container if a HUW temperature sensor regulator rises container is connected. Using the parameter of HUW temperature to 70 °C.
  • Page 37: Weather Control

    In this configuration a thermostat can be Preset mixer temperature will be increased connected. It will level inaccuracy of the by (22°C degrees – 20°C degrees) x 15/10 = heating curve adjustment in case when its 3°C degrees. Correct value of the parameter value will be too big.
  • Page 38: Description Of Night Time Decrease Settings

    Guidelines for proper settings 7.16 Description of night time decrease of heating curve : settings The regulator offers possibility to select the - underfloor heating 0.2 -0.6 time intervals for boiler, heating circuits, - radiator heating 1.0 - 1.6 HUW container and HUW circulating pump, at - boiler 1.8 - 4 which lower preset temperature may be set...
  • Page 39: Manual Control

    In case the boiler is adapted to burn fuel on knob in main window. Following info will additional grate, the feeder or the fan with appear: the feeder may be switched off. The settings are available in: MENU Boiler Settings . Note: When the fan goes OFF, the same time the feeder stops.
  • Page 40 Change of the service parameter: Tank Capacity cancels calibration of fuel level - then, the level is calculated on the basis of the parameters: Feeder Efficiency and Tank Capacity.
  • Page 41 USER MANUAL OF CONTROLLER INSTALLATION AND SERVICE SETTINGS ecoMAX 910R1...
  • Page 42 Hydraulic diagrams Shown hydraulic schemes do not replace the design of central heating and may be used only for informational purposes. Diagram with 4-way control valve for central heating circuit , where: 1 – boiler, 2 – ecoMAXX regulator – module A, 3 – ecoMAXX regulator – control panel, 4 – fan, 5 – feeder temperature sensor, 6 - gear-motor, 7 –...
  • Page 43 Diagram with 4-way valve and additional pump in the boiler circuit: 1 – boiler, 2 – ecoMAXX regulator – module A, 3 – ecoMAXX regulator – control panel, 4 – fan, 5 – feeder temperature sensor, 6 - gear-motor, 7 – boiler temperature sensor, 8 – HUW temperature sensor, 9 - mixer temperature sensor, 10 –...
  • Page 44 Diagram with 3-way thermostatic valve to secure return water temperature , where: 1 – boiler, 2 – ecoMAXX regulator – module A, 3 – ecoMAXX regulator – control panel, 4 – fan, 5 – feeder temperature sensor, 6 - gear-motor, 7 – boiler temperature sensor, 8 – HUW temperature sensor, 9 - mixer temperature sensor, 10 –...
  • Page 45 Diagram with two additional mixer circuits upon connection of additional Module B , where: 1 – boiler, 2 – ecoMAXX regulator – module A, 3 – ecoMAXX regulator – control panel, 4 – fan, 5 – feeder temperature sensor, 6 - gear-motor, 7 – boiler temperature sensor, 8 – HUW temperature sensor, 9 - mixer 1 temperature sensor, 10 –...
  • Page 46 Diagram with heat buffer and additional module B , where: 1 – boiler, 2 – ecoMAXX regulator – module A, 3 – ecoMAXX regulator – control panel, 4 – fan, 5 – feeder temperature sensor, 6 - gear-motor, 7 – boiler temperature sensor, 8 – HUW temperature sensor, 9 - mixer 1 temperature sensor, 10 –...
  • Page 48: Technical Data

    Technical Data Due to fire risk it is forbidden to use the controller in proximity of explosive gases or Power supply 230V~; 50Hz; dust. Moreover the controller cannot be used Current consumption by I = 0,2 A in conditions of water steam condensation or the regulator be exposed to effects of water.
  • Page 49: Electric Connection

    regulator directly to hot gases and accordance with applicable fire from the fireplace. regulations. In case of using the version with Caution: After regulator device before making turned using keyboard, montage and wiring it is strongly dangerous voltage can occur on the recommended to take out the STB terminals.
  • Page 50 All peripherals (such like: pumps, prevent contact with unsafe parts in the RE-marked relays connected case of falling out the lead from the recipients) may be connected only connector. by qualified person in accordance It is not allowed to coil excess of the with applicable regulations.
  • Page 53 Wiring diagram - modules B and C: T1 – mixer 2 or 4 temperature sensor CT4, T2 – mixer 3 or 5 temperature sensor CT4, T3 – upper temperature sensor of the buffer, T4 – lower temperature sensor of the buffer CT4, T5 – reserve, RE – relay (12V, max 80mA) to connect reserve boiler R, alarm AL, boiler shunt pump PP, or HUW circulating pump PC , T –...
  • Page 54: Temperature Sensors Connection

    11.6 Temperature sensors connection controller or properly to the used kind of controller. Wires of sensors can be extended by wires The sensor should be screw to the wall. with diameter no smaller than 0,5mm . Total Access to assembly holes is possible after length of wires in each sensor should not unscrewing the cover of the sensor.
  • Page 55: Connection Of Boiler ' S Room Thermostat

    thermostat for 5 min. When ,,0” is set, the CT2S (Pt1000) – exhaust gas CH pump will not be stopped by the room Temp. Min. Nom. Max. thermostat. Once this time has elapsed, the °C Ω Ω Ω regulator switches on CH pump for a time set 999,7 1000,0 1000,3...
  • Page 56 The reserve boiler should be connected via relay to terminals 43-44. Model diagram of layout for connecting a reserve boiler to the ecoMAXX regulator, where: 1- Hydraulic diagram with reserve boiler; regulator ecoMAXX, 2 – reserve boiler (gas- or oil- connection of open and close circuits 1 –...
  • Page 57: Connection Of Alarm Signaling

    Connection of an external alarm annunciator 1 - ecoMAXX regulator - module A, 2 – external alarm annunciator, 3 – relay RM 84-2012-35-1012 RELPOL and base GZT80 RELPOL, For proper operation, set proper value of the parameter: Active alarm signal code in: MENU Service Settings Boiler...
  • Page 58: Connection Of Mixer Servo

    values indicated in the table above for opening, temperature mixer sensor individual alarms (i.e. 2 + 8 = 10) and set so should increase. In other case, disconnect calculated sum. For signaling alarms: AL1, power supply regulator AL2 and AL3 - set ,”7” because the sum of 1 interchange the wires (Note: other reason of + 2 + 4 = 7.
  • Page 59: Stb Temperature Limiter

    Pressing of that button is only possible when temperature of water in the boiler drops. Version without temperature limiter If the regulator ecoMAX910R1 is not factory- equipped with the safety temperature limiter, the STB should be connected as an external device.
  • Page 60: Ds Input

    2-wire connection: For two-wire connection, power supply of 11.18 DS input 12V DC and rated current of min. 200mA is There is a possibility of connecting the sensor required. Disconnect GND and +12V wires that detects a door or fuel tank flap opening. from the module (2) and re-connect them to Opening contact...
  • Page 61 To update the software: disconnect power supply of the regulator. insert microSDHC memory card (other types memory cards supported) to a socket in the movable casing of the panel shown above. On the memory card there should be written new software in the *.pfc format as a 2 files: a file with the panel software and a file with the module A software.
  • Page 62: Boiler Service Settings

    BOILER SERVICE SETTINGS Burner Settings Power of the fan in SUPERVISION mode - too high value may Blow in output SUPERV. cause boiler overheating or flash back to the feeder; too low value - may result in fuel pouring. Time of fuel feeding in SUPERVISION mode; Too high value Feeding Time SUPERVISION may cause boiler overheating or fuel pouring;...
  • Page 63: Servis Settings Of Pumps

    Parameter used to rough calculation of boiler output (displayed Feeder Efficiency in INFO window) and of fuel level and it has no effect on control of combustion process [kg/h]. Parameter used to rough calculation of boiler output; it has no Energy Density effect on control of combustion process.
  • Page 64: Service Settings Of Mixer

    SUMMER function or HUW priority), NO (boiler pump in operation as usual). SERVICE SETTINGS OF MIXER Mixer support Mixer servo and mixer pump are OFF It is used when the mixer circuit supplies CH radiator system. Max. temperature of mixer circuit is not limited, mixer is fully opened CH ON during alarms e.g.
  • Page 65: Buffer

    BUFFER Buffer Support Switches ON/OFF buffer support. Temperature measured by upper buffer sensor at which buffer Buffer loading start temp. loading starts. Temperature measured by lower buffer sensor at which buffer Buffer loading end temp loading ends. Temperature measured by upper buffer sensor at which the pumps Min.
  • Page 66: Alarm Description

    ALARM DESCRIPTION Note: arrangement of temperature sensor outside the boiler water 17.1 No fuel jacket (e.g. at the outlet pipe) is In case the boiler temperature dropped in not recommended because boiler OPERATION mode by the value of DelT lack overheating may be detected with of fuel below the boiler preset temperature, delay.
  • Page 67: Feeder Control System Failure

    its measurement range. Upon occurrence of If the boiler temperature drops below 5 C, this alarm, boiler, HUW and mixer pumps the CH pump will be enabled, thus forcing start to possibly cool down the boiler. To circulation of the boiler water. This will delay reset the alarm - switch OFF and ON the the process of water freezing, yet in the case regulator.
  • Page 68 Troubleshooting Faults Hints Check: The display is blank despite if the main fuse is burnt-out and replace if so, connection to power supply. if the lead connecting the panel with the module is properly plugged in, and if it’s not damaged. Check, if: HUW container is being filled and preset HUW temperature is set at the value higher than boiler preset temperature.
  • Page 69 check whether correct type of boiler/ burner has been selected. See sec. 21.1 open fully fan baffle and/ or return flap clean off ducts supplying air to the furnace change Fuzzy Logic settings in: MENU → Service Settings → Boiler Settings → Burner Settings → Fuzzy Logic (accessible to boiler manufacturers only) increase fuel feeding rate by higher setting of the parameter Fuel correction in Fuzzy Logic mode.
  • Page 70 Regulator setting boiler parameter is available in separate menu manufacturer. upon entry of special password. CAUTION: THE INDIVIDUAL FUZZY LOGIC Change record PROGRAM IS SELECTED INDIVIDUALLY TO THE GIVEN BOILER TYPE. MAKE SURE THAT THE FITTINGS FOR BOILERS TESTED IN THE PLUM LABORATORIES COMPATIBLE...
  • Page 72 ul. Wspólna 19, Ignatki 16-001 Kleosin Poland tel. +48 85 749-70-00 fax +48 85 749-70-14 plum@plum.pl www.plum.pl www.plumelectronics.eu...
  • Page 73 Internet module ecoNET300 REMOTE CONTROL OF ecoMAX REGULATORS www.econet24.com OPERATION AND INSTALLATION MANUAL ISSUE: 1.0 OPERATIONAL CAN BE APPLIED TO: REGULATOR NAME: SYSTEM: WINDOWS XP,7,8, ecoMAX 800 series Android, Linux (excluding ecoMAX800R1, T1), 850, 860 2014-08-22...
  • Page 75 This sign indicates relation to safety issues. This sign indicates relations to module functional features.
  • Page 76 SAFETY Always turn boiler off before connecting the device. Do not use the device for other than intended use . Verify if boiler controller software is adapted to cooperate with ecoNET300 internet module. Connecting the module not in accordance with the manual or improperly can result in inappropriate operation of the controller or interruption of its operation.
  • Page 77 CONTENTS CONTENTS INFORMATION ............................ 6 COOPERATION OF ecoNET300 with ecoMAX CONTROLLERS .......... 7 THE ecoMAX CONTROLLER WITH MODULES ................7 CONNECTING WITH ecoMAX800 CONTROLLERS ..............8 CONNECTION WITH ecoMAX850 SERIES CONTROLLERS ..........9 CONNECTION WITH ecoMAX860 CONTROLLER ..............10 CONNECTION WITH INTERNET NETWORK ................11 LOGGING TO THE MODULE FROM A LEVEL OF LOCAL LAN NETWORK .....
  • Page 78: Information

    CONNECTION INFORMATION ecoNET300 enables boiler operation remote control via Internet or a local network. User can remotely monitor operation of the boiler and modify operation parameters of the boiler controller with the use of a tablet or mobile phone. Essential features of the module: ecoNET300 integrated WWW server enabling remote control of operation of the boiler within a local network without Internet access, cooperation with...
  • Page 79: Cooperation Of Econet300 With Ecomax Controllers

    CONNECTION COOPERATION OF ecoNET300 with ECOMAX CONTROLLERS ecoNET300 internet module will cooperate only with boiler controllers with installed software supporting ecoNET300. Check regulator software version before connecting a module with the controller. In the controller menu select tab: MENU Information Software →...
  • Page 80: Connecting With Ecomax800 Controllers

    CONNECTION CONNECTING WITH ecoMAX800 CONTROLLERS This chapter applies to ecoMAX800 P1, P2, R2, T2, D1, D2 controllers. It is not applicable to ecoMAX800R1 and ecoMAX800T1. In case of ecoMAX800 series, a EL2adapter must be used in order to connect ecoLINK2. The following diagram shows a connection method.
  • Page 81: Connection With Ecomax850 Series Controllers

    CONNECTION CONNECTION WITH ecoMAX850 SERIES CONTROLLERS ecoMAX850P1 or ecoMAX850D1 controller modules are equipped with an additional COM transmission socket to connect RJ14 plug of ecoLINK2 interface without using adapters. Just unscrew the controller housing and put the plug into a COM socket. 1 –COM socket (place of plugging a RJ14 interface plug), 2 –...
  • Page 82: Connection With Ecomax860 Controller

    CONNECTION Location of the controller transmission socket: interfejs ecoLINK2,On Diagram includes: transmission socket (connection point between cable and divider), divider, control panel, additional ecoTOUCH control panel (in ecoMAX850I version) ecoSTER, additional cable to a divider. CONNECTION WITH ecoMAX860 CONTROLLER In case of ecoMAX860 series, a EL2adapter must be used in order to connect ecoLINK2.
  • Page 83: Connection With Internet Network

    SETTINGS CONNECTION WITH INTERNET NETWORK ecoNET300 requires constant access to a wire LAN or wireless WiFi network in a place of installation of the boiler controller. RJ45 Ethernet Port mini USB Port 3G USB Port Mode Switch Connect adapter plug to a mini USB Port socket and 3G USB...
  • Page 84 SETTINGS Condition ecoNET300 operation condition Power on Power Power off Connection Active connection of the with a controller. controller No connection with boiler controller. Connection to a programmed Connection wireless network is on. with WiFi No connection with wireless network. Connection with Deleting user name and Connection...
  • Page 85 SETTINGS In case of connection with a chosen Access Point via wireless network, user has to know the settings of WiFi network which the module will be connected to: network name (SSID), protection type, access password). In case of connection with LAN wire network, ecoNET Ethernet tab will be available in controller menu from which the IP number,...
  • Page 86 SETTINGS Network settings select Security. Select and confirm encryption type in WiFi network (most often selected type is WPA2). Go to Password Enter Wi-Fi access password using letters / characters available on the list and a knob on the controller panel. Confirm with (ENTER).
  • Page 87 SETTINGS Wi-Fi network parameters (SSID, protection type and password) can be also configured from a level of ecoNET300 website after previously connecting it to a LAN wire network.
  • Page 88: Logging To The Module From A Level Of Local Lan Network

    OPERATION LOGGING TO THE MODULE FROM A LEVEL OF LOCAL LAN NETWORK WWW server incorporated in ecoNET300 module enables remote management of boiler operation on LAN local network without any access to the Internet. Enter : http://module IP address in the address field of the internet browser. Where: can be read out from the boiler controller menu: MENU Information...
  • Page 89: Logging Into Econet Account

    OPERATION LOGGING INTO ecoNET ACCOUNT ecoNET300 internet module cooperates with external server which is available under www.econet24.com. This provides access to the boiler controller via Internet. In order to log into an account on an external server, enter www.econet24.com into an address field of the web browser. In case of first logging, select: Create new account...
  • Page 90 OPERATION From ecoNET WiFi tab in the boiler controller main panel, read the UID number (unique ID of the controller): MENU Information ecoNET WiFi → → Fill in the form with user data and password. Obligatory fields: E-mail, Password, Password (again), identifier controller..
  • Page 91 OPERATION Remote access to the controller by the service and the producer – enables access edit controller parameters service boiler manufacrurer. Enable sending alarm notices on e-mail) –In case an alert occurs, an alarm message including alarm contents will be sent. On previously entered e- mail address.
  • Page 92: A Website For Managing Operation Of The Boiler Controller

    OPERATION A WEBSITE FOR MANAGING OPERATION OF THE BOILER CONTROLLER Description of menu on a website for managing operation of the boiler controller: Data archive of selected controller operation List boiler Change enables to parameters. controller alarms. choose another available only in a type...
  • Page 93 OPERATION “Current Data” tab includes tiles with values of basic boiler operation parameters. Parameter refreshing time is preset by the user (tab: Settings). A parameter to be modified is indicated by symbol. Click a tile and Modify value window will appear. Enter new value, e.g. Boiler temperature and confirm with [Save].
  • Page 94 OPERATION A parameter to be modified is indicated by symbol. Click a tile and Modify value window will appear. Enter new value, e.g. Boiler temperature and confirm with [Save].
  • Page 95 OPERATION Basic parameters of controller operation are displayed in “User parameters” tab. These parameters are grouped and all can be modified by the user. Click on a name of selected group of parameters, e.g. Boiler settings open list available parameters. Select a parameter to be modified, enter new value in additional window and confirm with [Save}.
  • Page 96 OPERATION Choose time period data readout by clicking From: or To: (select date and time in a calendar). Confirm with Done. Select parameters from a drop-down list [ ] and confirm with [ + ] in order parameters visualized. Clear parameters with [X] button.
  • Page 97 OPERATION In “Alarms” tab: user can read a list of registered alarms and other events sent by the boiler controller. a type of alarm, event and period of its occurrence is displayed. Log into www.ecoNET24.com in order to display all logs of alarm conditions from the beginning of operation of the controller.
  • Page 98 OPERATION “Device settings” tab in server version enables to: change the boiler regulator installation address, label name, service access and advanced user password, readout a software version in the controller module and additional modules or panels, update internal ecoNET300 software, Enter new data in a form and press [Submit].
  • Page 99 OPERATION EcoNET24 server periodically checks availability software version for the ecoNET300 module. In Device settings tab it displays information concerning a new software version. All the user needs to do is to press [Update]. Software update process can be shorter or longer depending on the speed of Internet connection.
  • Page 100 OPERATION In “Settings” tab in local version user can: read address status Ethernet WiFi network (Connected/Disconnected), read the WiFi signal strength [%], display information concerning IP address of the main econet24 server, its status and availability. After pressing “Check server availability” button, user can check if the external server is available from a level of Internet browser (excluding ecoNET300 module), read information concerning selected controller: identifier, UID number,...
  • Page 101 OPERATION [Change password] key enables to change login data (user name and password) to the ecoNET300 Internet module. Enter old and new data into fields. Save changes by clicking [OK]. In case the user has forgotten his password for logging in the ecoNET300 Internet module, it is possible to restore default data with the use of a button on the ecoNET300 housing.
  • Page 104 Ignatki 27a, 16-001 Kleosin Poland tel. +48 85 749-70-00 fax +48 85 749-70-14 plum@plum.pl www.plum.pl www.plumelectronics.eu...