Thank you for choosing the PEREKO heating boiler. This documen- The set of documents delivered with the boiler includes a con- tation concerns the π series induction boilers. This operation man- troller operation manual. Read through that document as well.
1. INTRODUCTION AND GENERAL NOTES 1. Before connecting the induction boiler, the user must 3. All electrical connections must be installed with discon- read this operation manual thoroughly. nected power supply. 2. The installation of the π series boiler as well as the cen- 4.
2. FIRST START UP OF THE π SERIES BOILER First start up of the π series induction boiler must be performed by a properly authorised person. It is confirmed with a “Certificate of launching of the π series induction boiler”. 2.1.
3. INSTRUCTIONS FOR THE FITTER 3.1. Technical data Model Parameter Unit. Rated power* [kW] Power supply 3N~* 400 Frequency* [Hz] Efficiency Maximum current consumption 16.0 30.3 Rated current of overcurrent circuit breaker Minimum cross section of power cable [mm] 5 × 2.5 5 ×...
Page 6
3.2.1. Simplified layout of the π series boiler components 1. Control panel 2. Boiler temperature sensor 3. STB 4. Flow sensor 5. SSR relay 6. Relay radiator with a fan 7. Exchanger 8. Relay switch 9. Overcurrent fuse 10. Power supply cable connection 11.
3.3. Hydraulic connection Hydraulic connections must be installed by properly au- below 0°C, unless a non-freezing fluid is used as the heat- thorised persons. The hydraulic system should be designed ing agent. The induction boiler connection with the central according to the standards: PN-B-02414:1999 – closed heating system and the domestic hot water system shall system and PN-91/B-02413 –...
3.4.2. RM1C60D50 semi-conductor relay diagram 4. USER MANUAL Before boiler installation, check the requirements and guidelines contact with manufacturer’s REPRESENTATIVES performing war- included in the user manual. That document must be provided ranty service is recommended. by the distributor or fitters of the π series induction boiler. Direct 4.1.
5. TRANSPORT AND STORAGE Boilers may be transported horizontally using roofed vehicles. may be stored in dry warehouses, where no chemically active During the transport, boilers must be fixed with equipment substances are present. preventing tipping over and mechanical damage. The boilers 6.
9. WARRANTY TERMS AND CONDITIONS 1. The manufacturer of PEREKO boilers is Envo sp. z o.o. with the 10. Any repairs shall be confirmed with an entry in the warranty registered office at ul. Radomska 76, Starachowice, Poland.
• fire, flooding, thunder strike, power supply network 18. The Guarantor shall not be responsible for loss and dam- surge, improper power supply voltage, or the effect of age incurred as a result of the impossibility to use a faulty other external factors or natural forces.
Page 12
SERVICE SUPPORT Date Comments Signature Page Operating and maintenance manual π series induction boilers...
Page 14
WARRANTY CARD π series induction boiler The manufacturer of PEREKO boilers is Envo sp. z o.o. with the registered office at ul. Radomska 76, Starachowice, Poland. The manufacturer grants a 2-year warranty for the faultless operation of the π series induction boiler.
Page 15
FIRST OPERATION CERTIFICATE π series induction boiler π 10 kW π 21 kW Induction boiler type Boiler serial number Date of launch Installation address User (company) name Launch Hydraulic connection (date, legible signature of authorised person) (date, legible signature of the Fitter) (stamp and licence number of authorised person) (stamp and licence number of the Fitter) Launch confirmation...