Titan Controls Helios 7 Instruction Manual

Titan Controls Helios 7 Instruction Manual

8 light - 240 volt controller

Advertisement

Notes:
_________________________________________________
®
_________________________________________________
_________________________________________________
Helios
7
_________________________________________________
®
_________________________________________________
_________________________________________________
8 Light - 240 Volt Controller
________________________________________________
Instruction Manual
1 Square = ____ Foot/Feet
VANCOUVER, W ASHINGTON U.S.A.
VANCOUVER, W ASHINGTON U.S.A.
www.titancontrols.net
Revision E – 01/13/2015 © Titan Controls
www.titancontrols.net
Part #111239

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Helios 7 and is the answer not in the manual?

Questions and answers

Summary of Contents for Titan Controls Helios 7

  • Page 1 _________________________________________________ _________________________________________________ Helios _________________________________________________ ® _________________________________________________ _________________________________________________ 8 Light - 240 Volt Controller ________________________________________________ Instruction Manual 1 Square = ____ Foot/Feet VANCOUVER, W ASHINGTON U.S.A. VANCOUVER, W ASHINGTON U.S.A. www.titancontrols.net Revision E – 01/13/2015 © Titan Controls www.titancontrols.net Part #111239...
  • Page 2 Once we receive the unit back, we will repair the controller within 48 hours (business) and return it to you freight prepaid via UPS ground shipment Warnings & Cautions Include the following if returning directly to Titan Controls ® • Read all instructions before operating Helios 7 lighting controller.
  • Page 3 ® ONLY FOR USE WITH 240 VOLT BALLASTS • Factory calibration services are available for all Titan Controls ® To maintain warranty you MUST retighten incoming power connections every 90 days.
  • Page 4 Troubleshooting Tips Installation Example If the Helios 7 is not performing as expected, try the following: ® a. Confirm that your power input is active from your breaker panel and providing 240 Volts/ 50 Amps/60 Hz to the controller. b. Check the voltage input of your incoming cord set using a voltage test meter to verify power is flowing to the controller.

Table of Contents