7
3
4
5
Figure 7
1. Bolt, 5/8 x 7/8 inch
2. Lock washer, 5/16 inch
3. Washer, 5/16 inch
4. Spring
Step
4
Installing the Control Rods
Parts needed for this step:
Qty.
2
E–ring
Procedure
1. For a starting point, make sure the rod fittings are
threaded approximately 2–1/2 inches (63 mm) onto the
control rods (Fig. 8).
2. Install the rod fittings into the control arm and secure
them with E–rings (Fig. 8).
6
3
2
1
m–6583
5. Locknut
6. Hose clamp
7. Fuel tank connection
Part
5
4
2
1. Control rod
2. Rod fitting
3. 2–1/2 inch (63.5 mm) from
bottom
3. Place the clevis pin into the control rod, drive lever
and neutral lock (Fig. 9).
4. Install hairpin cotter between drive levers and neutral
locks and into clevis pins (Fig. 9).
4
3
5
7
1. Left handle shown
2. Neutral lock
3. Clevis pin
4. Drive lever
18
1
3
Figure 8
4. E–ring
5. Control arm
6
1
2
Figure 9
5. Control rod
6. Operator Presence
Control lever (OPC)
7. Hairpin cotter
m–6601
m–6639