Putting Into Operation; Scope Of Delivery; Check For Operational Readiness - ADS-tec VMT7000 series Instruction Manual

Hide thumbs Also See for VMT7000 series:
Table of Contents

Advertisement

VMT7000 series

6 Putting into operation

6.1 Scope of delivery

Please check that all of the following components are contained in the packaging:
• 1 x device
• 1 x 4-pin plug for power supply
Optional scope of delivery:
• Operating system (license / opt. DVD*)
• Installation kit
• Power adapter
* depending on operating system

6.2 Check for operational readiness

Check the device to determine whether hidden damages have been caused by improper transport,
incorrect operation / storage conditions or improper handling.
If you find any damage, contact the manufacturer immediately. The device must not be put into
operation.
The power supply and the device interfaces are located in the service slot.
It has to be removed in order to connect the power supply lead and the interface cables.
All necessary cables must be connected at the beginning of commissioning.
ATTENTION
Hazard due to condensation
Damage to electronic components caused by
condensation resulting from temperature
fluctuations.
 The device should only be switched on after it
has acclimated to the ambient temperature!
 To avoid overheating in operation: The device
must not be exposed to direct radiation by
sunlight or any other heat source.
ATTENTION
Damage due to electrostatically sensitive
components
Damage to the device can be caused by
electrostatically sensitive components.
 All installation and service work performed on
the device must be performed only under safe,
secure and de-energised conditions.
Recommendation for use:
The shielding of a data cable must always be connected with the connector
housing (EMC).
© ads-tec GmbH • Heinrich-Hertz-Str. 1 • 72622 Nürtingen • Germany
27

Advertisement

Table of Contents
loading

Table of Contents