Sanyo VPC-CG102BK Service Manual page 14

Hide thumbs Also See for VPC-CG102BK:
Table of Contents

Advertisement

2-5. REMOVAL OF TB1 BOARD, VF1 BOARD AND LCD
1. Two screws 1.7 x 3
2. Assy, COV LCD B SV
3. Spacer line
4. Connector (CN170)
5. Remove the solder.
6. Spacer MR
7. Cover joint B
8. Screw 1.7 x 2
9. Cover joint A
14
10
When assembling
10
10. Spacer joint (removed after assembly)
11. Assy, joint
12. Screw 1.7 x 2
13. TB1 board
14. Assy, wire VF1 & CP1
15. Assy, magnet
16. Four screws 1.7 x 3
17. Assy, COV LCD F SV
18. Connector (CN171)
17
19
21
4
5
6
15
13
7
11
9
8
11
9
10
14
18
23
22
12
D
3
1
10
– 14 –
19. LCD
20. Spacer VF
21. Two screws 1.7 x 2
22. VF1 board
23. Spacer VF1 LCD
24. Assy, holder moni SV
When assembling,
tighten the screws order.
24
A → B→ C→ D
16
C
B
20
A
16
2

Advertisement

Table of Contents
loading

Table of Contents