Operating The Boiler; Controls - Worcester GREENSTAR CDi CLASSIC REGULAR ErP User Instructions

Wall hung rsf gas fired condensing regular boiler
Table of Contents

Advertisement

3

OPERATING THE BOILER

3.1

CONTROLS

10
9
8
7
3
4
5
2
6
1
6
max
Fig. 1
Control panel
[1] Display
[2] Reset button
[3] Not used
[4] Not used
[5] ON/OFF and fault indicator (blue)
[6] Central heating temperature control
[7] Performance test button
[8] Service button
[9] Burner indicator (green)
[10] ON/OFF button
GREENSTAR CDi CLASSIC REGULAR
1
2
reset
3
eco
4
5
ErP
– 6 720 815 726 (2015/05)
Operating the boiler
5

Advertisement

Table of Contents
loading

Table of Contents