Honeywell Dolphin 6510 User Manual page 69

Hendheld computer
Table of Contents

Advertisement

2. Slide the bolt through the wall bracket, and thread the toggle nut onto
the bolt.
3. Press the ends of the toggle nut together, and insert the bolt/nut into the
pilot hole until the nut clears inside wall surface. The toggle nut should
spring open preventing the screw from being removed.
4. Repeat steps 2 and 3 for each of the remaining mounting holes.
5. Tighten all four bolts to secure the bracket to the wall.
6. Once the bracket is installed, secure the base to the wall bracket, see
Securing the Base to the Wall Bracket
Wood Stud Installation
1. Drill four pilot holes in the wall/wood stud using the 1/4 in. drill bit.
2. Secure the bracket to the wall using the four Hex Head Lag Screws provided.
3. Once the bracket is installed, secure the base to the wall bracket,
Bracket
for detailed instructions.
Securing the Base to the Wall Bracket
You can secure the base to the wall bracket using the optional DIN rail.
Hardware Required
• DIN Rail, Qty. 1
• 3/16 in. dia x 5/8 in. long pan head screw, Qty. 2
• 1/2 in. OD x 7/32 in. ID x 3/64 in. thick washer, Qty. 2
• 3/16 in. dia nut, Qty. 2
1. Position the DIN Rail on the wall bracket, as shown below.
2. Slide the screw through the slot on the DIN Rail and the mounting hole in the bracket.
for detailed instructions.
Toggle Nut
Bolt
Bracket
Wall
Bracket
Securing the Base to the Wall
Wall
Open
Toggle Nut
10-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents