Equipment Installation - DAYLIFF SUNFLO-S 150 Installation & Operating Manual

Solar pumping systems
Table of Contents

Advertisement

Average Daily Irradiation Values (Kwhr/m)
6.3 6.5
6.0
5.8
5.6
Jan Feb Mar Apr May Jun Jul Aug Sep
1.3 PUMP DATA
Pump Model
SUNFLO-S 150
SUNFLO-S 300
SUNFLO-A 150H
SUNFLO-A 270H
SUNFLO-A 600H
SUNFLO-B 120H
SUNFLO-B 500C
SUNFLO-B 1000C

2. EQUIPMENT INSTALLATION

Before commencing installation check all systems components that should include the
pump with cable, safety rope, DC Isolator, controller (if applicable), supply cable for PV
module array to pump controller/isolator, pipe fittings and PV solar modules.
Also required will be the necessary length of piping, surface pipe fittings and module
support which is not included in the systems but is available from the pump supplier on
request.
2
6.5
5.8
5.6 5.7 5.9
5.1 5.3
Oct Nov Dec
Graph 1
Input
Indicative
Voltage
Performance
(V)
3
1m /day at 30m
24
3
3m /day at 60m
24
3
2m /day at 30m
24
3
3m /day at 50m
36
3
4m /day at 70m
48
3
3m /day at 30m
24
3
6
m /day at 0m
4
48
3
12m /day at 70m
110
SunFlo-A
SunFlo-B
% Daily Output
12%
10%
7%
2%
0%
6
7
8
9
10
Open
Peak
Motor
Circuit
Voltage
Rating
Voltage
(V)
Watts
(VoC)
120
24
≤50
300
150
≥20
≤60
270
600
≥30
≤125
120
≥30
≤50
500
≥60
≤100
1000
≥112
≤200
104mm
H
SunFlo-S
2
13.5%
13%
13%
12%
10%
7%
2%
11
12 13 14 15 16 17 18
Time (hrs)
Graph 2
Cable
PV
length,
Modules
2.5mm
1x200W
30m
2x200W
60m
1x200W
30m
2x200W
50m
4x200W
70m
1x200W
30m
4x200W
40m
8x200W
70m
0%
Outlet
Size
2
½"
¾"
1"
1¼"