AP8082DN and AP8182DN
Hardware Installation and Maintenance Guide
Figure 6-93 Fastening the body and back shell
Step 6 Push the heat-shrink tubing towards the connector, as shown in
tube.
Figure 6-94 Assembled N connector
Step 7 After the components are assembled, install the connector, as shown in
Issue 03 (2019-04-01)
Copyright © Huawei Technologies Co., Ltd.
6 Appendix
Figure
6-94. Then, heat the
Figure
6-95.
102