ECR International Dunkirk DMG-380 Installation, Operation & Maintenance Manual page 9

Condensing gas fired floor or wall mounted boiler
Table of Contents

Advertisement

FIGURE 4-1a Clearance to Combustible Materials
(See Table 2, page 8)
A
0" (0mm)
B
1-3/4"
(45mm)
Boiler Front
F L O O R
FIGURE 4-1b Clearance to Combustible Materials
(See Table 2, page 8)
Boiler Left Side View
E
0" (0mm)
E
0" (0mm)
4 - LOCATING BOILER
A
0" (0mm)
C
1-3/4"
(45mm)
View
A
0" (0mm)
D
1-3/4"
(45mm)
F L O O R
FIGURE 4-2a Service Clearances - Boiler Front View
Front View
FIGURE 4-2b Service Clearances - Boiler Left Side
View
Boiler Left
Side View
FIGURE 4-2c Combustible Clearances - Closet
Installation
CLEARANCES REQUIRED FOR CLOSET
INSTALLATION
1 3/4 "
( 400 mm)
CLOSET INSTALLATION
0 in. /0 mm between the Back of the Unit and the wall
9
Boiler
3/4 "
17
(
mm)
450
Minimum Service
clearance to front
of boiler
BACK
1 3/4 "
( 400 mm)
TOP VIEW
1 3/4 "
( 400 mm)
PN 240011664, Rev. F [07/30/2018]