Installation Checklist - Compac C4000 BioBlend Installation Manual

Table of Contents

Advertisement

Installation Checklist

When a new unit is being installed use the following checklist to make sure the unit is fully
operational. Check each box or write N/A where not applicable. Refer to the relevant installation
manual for procedures.
Mechanical Checks
Check unit is undamaged and has not been tampered with.
Is the unit in a sheltered position and facing away from the prevailing
wind and rain?
Check all panels are securely fastened using tamper-proof fastenings
where supplied.
Check that all cable entries to unit are through glands.
Power on Checks
Check that the CE board, FMS board, pinpad, printer, cardreader, router
and modem all power up.
Check pumps are re-priced to the current fuel price.
Check that different fuels are correctly priced on all hoses.
Transaction Checks
Complete transaction using white card/CWID/HID/Pin authorisation
methods
Complete transaction using credit card (credit card DCA only).
Check that all hoses can be selected and authorised by the unit.
Check all hoses stop on or before the pre-authorised value (credit card
DCA only).
Receipt Checks (where fitted)
Check that the correct $, L and fuel grade are printed on the receipt.
Check the date, time and header information is correct.
USB Module Checks (where fitted)
Check the supplied USB key is recognised by the unit.
Select "Get Transactions" and check that transactions are uploaded to
the USB key.
18.
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the C4000 BioBlend and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents