Sharp VL-AX1S/H Service Manual page 17

Liquid crystal digital camcorder
Table of Contents

Advertisement

8-5. Reassembly
8-5-1. Reassembly in side of the main chassis.
Note) Numbers before part names are given as a guide to the order of assembly.
As for greasing/oiling/cleaning places refer to the attached drawings (Grease/Oil application side of the main chassis).
1.
Groove grease
Pinch control lever
Main chassis Ass'y(Front surface)
Mode SW
A-3
A-2
A
A-1
2.
Cam groove grease
Main cam
Coupling
gear
EJECT control lever
EJECT lever
B
3.
Loading motor Ass'y
T arm control lever
Groove grease
C
Loading lever
Groove grease
C
D
Pinch drive lever
LM/Mode FPC
Item
Tightening torque Quantity
S Tight · M1.4 x L3
70mN·m
Shifter drive lever Ass'y
B
AHC cam
Sub cam
Item
Tightening torque Quantity
CWø1.2-ø3.0-t0.25
D
Loading motor
fitting Ass'y
Capstan motor
C
Slide chassis
guide
Item
Tightening torque Quantity
Special screw ·
40mN·m
M1.4 x L1.6
Special screw with step·
70mN·m
M1.4 x L6.25
4.
E
T arm control
lever stopper
3
5.
Phase match check
1
6.
Sup pole base Ass'y
S loading arm
Ass'y
S pressure spring
S loading gear
2
1
17
VL-AX1S/H/E/EW/EX
E
Intermediate gear angle
H/A PWB angle
sub Ass'y
F
Center pulley
Ass'y
Drive belt
Intermediate pulley
Ass'y
Capstan FPC stopper
C
Item
Tightening torque Quantity
C
Special screw ·
40mN·m
M1.4 x L1.6
E
S Tight · M1.4 x L4
70mN·m
F
S Tight · M1.4 x L2
70mN·m
G
G
Enter part of
convexity rear
surfacer
Guide rail sub Ass'y
Guide rail sub Ass'y
(Rear surface)
Item
Tightening torque Quantity
G
Special head screw ·
40mN·m
M1.4 x L1.5
Guide roller Ass'y
I
Tu pole base
Ass'y
I
Guide rail
H
Tu loading arm Ass'y
H
Tu pressure spring
Tu loading gear
Item
Tightening torque Quantity
H
CWø0.7-ø2.2-t0.25
I
Special screw ·
5mN·m
M1.2 x L1.8
(Tentative tightening)
Intermediate gear
stopper
1
2
1
Phase match check
2
2
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vl-ax1eVl-ax1ewVl-ax1ex

Table of Contents