To install the system into the rack, complete the following steps:
Procedure
1. Remove the shipping cover on the rear and the front of the system, if present.
2. Extend the slide rails forward (1) until they click twice into place. Carefully lift the server and tilt it into
position over the slide rails so that the rear nail heads (2) on the server line up with the rear
slots (2) on the slide rails. Slide the server down until the rear nail heads slip into the two rear slots.
Then, slowly lower the front of the server (3), (4) until the other nail heads slip into the other slots on
the slide rails. Ensure that the front latch (5) slides over the nail heads until it clicks into place.
Figure 6. Place the server onto the mounting hardware
3. Push the release buttons on both rails (1) and push the server (2) all the way into the rack until it clicks
into place.
8 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922
(9223-22H), or IBM Power System H922S (9223-22S)