Setup; Loose Parts Chart - Toro Greensmaster 3000 Series Operator's Manual

8 and 11 blade dpa reel mowers
Hide thumbs Also See for Greensmaster 3000 Series:
Table of Contents

Advertisement

Setup

Note: Determine the left and right sides of the machine from the normal operating position.

Loose Parts Chart

Note: Use this chart as a checklist to ensure all parts necessary for assembly have been shipped. If any of these parts are
missing, total setup cannot be completed.
Description
Lift link (hoop)
Lift link (chain link)
Mounting bracket
Capscrews
Ball stud
Operator's manual
Parts catalog
Certificate of compliance
Registration cards
1. The cutting unit is shipped without a front roller. Install
the roller using the loose parts supplied with the cutting
unit and installation instructions included with the
roller.
2. Ensure that all nuts and bolts are securely fastened.
3. Install the proper lift link to match the suspension.
Hoop link (Fig. 2) for Greensmaster 3000, 3000–D,
3050, 3100 and 3150 traction units. Install hoop link
to top of cutting unit with (2) capscrews. Torque
capscrews to 25–30 ft–lbs. (34–40 N m).
1
Figure 2
1. Hoop link
Qty.
Use
1
Mount to cutting unit
1
Mount to cutting unit
1
2
Use to mount lift link to cutting unit
2
Mount to roller
1
Read before operating the machine.
1
1
2
Fill out and return to Toro.
Chain link (Fig. 3) for Greensmaster 3250–D
traction unit. Install chain link to top of cutting unit
with mounting bracket and (2) capscrews. Torque
capscrews to 25–30 ft–lbs. (34–40 N m). Large end
of link to hook on traction unit suspension.
2
1. Chain link
5
1
Figure 3
2. Mounting bracket

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

0461004611

Table of Contents