Table Of Contents - Viessmann Vitocrossal 200 Service Instructions For Contractors

Gas condensing boiler with matrix radiant burner 6 bar
Hide thumbs Also See for Vitocrossal 200:
Table of Contents

Advertisement

Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Checking the high limit safety cut-out setting................................................................
2. Filling the heating system with water and venting.........................................................
3. Filling the trap with water..................................................................................................
4. Commissioning the system...............................................................................................
5. Checking the gas type....................................................................................................... 11
6. Converting to natural gas LL............................................................................................ 11
7. Reducing the operational output (if required)................................................................. 12
8. Checking static pressure and supply pressure.............................................................. 13
9. Checking the rotary damper setting................................................................................. 15
11. Checking the CO content
13. Displaying the ionisation current..................................................................................... 19
14. Shutting down the system................................................................................................. 20
15. Opening the boiler door..................................................................................................... 20
16. Cleaning the combustion chamber and heating surfaces............................................. 20
17. Checking the gaskets and thermal insulation sections................................................. 20
tightness............................................................................................................................. 21
20. Cleaning and reconnecting the condensate drain system............................................. 22
22. Checking the burner gauze assembly.............................................................................. 23
23. Checking the ignition electrodes and ionisation electrode........................................... 23
24. Closing the boiler door...................................................................................................... 24
25. Cleaning the burner........................................................................................................... 24
26. Fitting the burner................................................................................................................ 25
27. Checking the gas train valves for tightness.................................................................... 26
28. Checking the filter element in the gas line...................................................................... 26
29. Checking gas connections for tightness......................................................................... 26
30. Checking the gaskets on the flue gas side...................................................................... 27
31. Performing final checks..................................................................................................... 28
32. Checking the water quality................................................................................................ 28
34. Expansion vessel .............................................................................................................. 28
35. Checking the mixer for ease of operation and leaks...................................................... 28
37. Checking the installation room ventilation air apertures............................................... 29
38. Instructing the system user.............................................................................................. 29
content................................................................................................. 16
2
Commissioning, inspection, maintenance
Page
9
9
9
9
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cm2bCm2

Table of Contents