Mitsubishi Electric CITY MULTI PUHY-400YMF-C Service Handbook page 152

Table of Contents

Advertisement

(4)
Constant Capacity Unit
Observe the following notes when changing the compressor
(1) Make sure the main power supply is turned off.
If the reason for the compressor replacement is faulty insulation resistance, if the insulation resistance (Mega-
check) is 1 M or greater, it is possible that it has dropped due to the dormancy of the refrigerant to the compres-
sor, so after turning on the power for 12 hours with a belt heater heating, turn off the power and check the insulation
resistance again.
(2) Remove the fin guard, front panel, and front panel of the divider panel.
(3) Drain out the refrigerant from the high pressure and low pressure check joints.
(4) Remove the compressor terminal cover, then disconnect the power cable.
(5) Disconnect the discharge temperature sensor.
(6) Disconnect the crankcase heater.
(7) Heat up the soldered portions of the discharge piping, suction piping, and process piping and disconnect the piping.
(8) Remove the compressor mounting nuts, then remove the compressor.
Caution: When removing the compressor, be careful not to let oil from inside the compressor overflow from the
suction piping and process piping.
(9) Replace the compressor (service parts).
Caution: Do not use a compressor for another model.
The refrigerator oil is different for each model, so be sure to check!
PUHN-YMF-C
PUHN-PYMF-C
ZEC133YAA
(10) Braze the discharge piping, suction piping, volume control valve piping and process piping.
(11) Shut the ball valves (liquid, gas, and oil balance pipe) on the outdoor unit and apply nitrogen from the high and low
pressure service check joint, up to a pressure of A, checking to make sure there is no leakage.
2.94 MPa ------- PUHN-YMF-C
*A =
2.98 MPa ------- PUHN-P-YMF-C
(12) Discharge the nitrogen gas.
(13) Open the ball valves (liquid, gas, and oil balance pipe) on the outdoor unit and apply a vacuum.
(14) Install the crankcase heater
(15) Mount the discharge temperature sensor and attach the insulating cover.
(16) Connect the power cable to the compressor's terminals.
Caution: Be careful not to misalign the three phases. If the wires are connected wrong, it could damage the
compressor.
(17) When applying the vacuum is completed, charge the unit with the amount of refrigerant it is charged with at the
factory, and with the supplementary amount it is charged with upon installation.
(18) After reconfirming the phase of the power cable wires at the compressors' terminals, carry out an insulation
resistance check, then install the terminal cover and turn on the main power supply, checking if current is flowing to
the crankcase heater.
Caution: When the ambient temperature is 5 C or lower, if you do not spend 4 hours with the power on to the
heater, the unit will not function even when the remote controller is operated.
(19) Make sure the ball valves of liquid, gas, and oil balance pipe are opened.
(20) Run all the indoor units and make sure they are operating normally.
Type 200
Type250
ZH133YDA
ZH165YDA
ZEC165YAA
-149-

Advertisement

Table of Contents
loading

Table of Contents