Installing the 9C214-2 Power Supply
Powering Up a 9C214-2 Power Supply
Before you power up a 9C214-2 Power Supply, make sure that the Environmental
NOTE
Module and all modules have been properly installed.
1. Turn on the 9C214-2 Power Supply using the circuit breaker at the bottom
right of the power supply. (The power supply uses a soft start feature and
does a pre-power diagnostic check. Outputs become enabled within 5 seconds
of power on.)
2. Check to make sure that
a. The PWR Status LED is green.
b. The SMB Status LED is green.
If the LEDs are any color other than green, refer to LANVIEW LEDs in Chapter 3.
2-6