Disassembly And Checking Of Smps & Ac Inlet - Panasonic VIERA SA-BX500EB Service Manual

Av control receiver
Table of Contents

Advertisement

SA-BX500EB / SA-BX500EE / SA-BX500EG
Special Note: For replacement of IC5200, IC5300, repeat the
(Step 1) to (Step 8). Refer to the diagrams of D-Amp B (3CH)
P.C.B. (Item 14.8) for location of the parts.
7.8.
Disassembly and checking of
SMPS & AC Inlet P.C.B.
• • • • Follow (Step 1) to (Step 4) of Item 7.3.
• • • • Follow (Step 1) to (Step 3) of Item 7.5.
• • • • Follow (Step 1) to (Step 10) of Item 7.6.
Step 1 Remove 2 screws on DSP P.C.B.
Step 2 Move aside DSP P.C.B. as arrow shown.
Step 3 Flip D-Amp P.C.B. as arrow shown.
Step 4 Connect extension cable REEX0815 (17P cable from
CN2808 to CN5050).
Step 5 Remove 5 screws.
Step 6 Move up the support bar as arrow shown and beware of
the catches.
Step 7 Remove 6 screws on SMPS and AC Inlet P.C.B..
34

Advertisement

Table of Contents
loading

This manual is also suitable for:

Viera sa-bx500eeViera sa-bx500eg

Table of Contents