Outdoor Unit Installation
*1. Pipe length vs. vacuum pump run time.
Pipe length
Run time
*2. If the compound pressure gauge pointer swings back, refrigerant may have water content or a loose pipe joint may exists.
Check all pipe joints and retighten nuts as needed, then repeat steps 2) through 4).
6.
Refilling the refrigerant
Check the type of refrigerant to be used on the machine nameplate.
Fill from the gas pipe in liquid form.
Important information regarding the refrigerant used
This product contains fluorinated greenhouse gases.
Do not vent gases into the atmosphere.
R32
Refrigerant type:
(1)
675
GWP
value:
Please fill in with indelible ink,
the factory refrigerant charge of the product,
the additional refrigerant amount charged in the field and
the total refrigerant charge
tCO
eq calculation according to the formula (rounded up
2
to 2 decimal places)
on the refrigerant charge label supplied with the product.
NOTE
National implementation of EU regulation on certain fluorinated greenhouse gases may require to provide the appropriate official national language on the unit.
Therefore an additional multilingual fluorinated greenhouse gases label is supplied with the unit. Sticking instructions are illustrated on the backside of that label.
NOTICE
In Europe, the greenhouse gas emissions of the total refrigerant charge in the system (expressed as tonnes CO
is used to determine the maintenance intervals. Follow the applicable legislation.
Formula to calculate the greenhouse gas emissions:
GWP value of the refrigerant × Total refrigerant charge [in kg] / 1000
Use the GWP value mentioned on the refrigerant charge label. This GWP value is based on the 4th IPCC Assessment
Report. The GWP value mentioned in the manual might be outdated (i.e., based on the 3rd IPCC Assessment Report).

Pump Down Operation

In order to protect the environment, be sure to pump down when relocating or disposing of the unit.
1) Remove the valve cap from liquid stop valve and gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop forced cooling operation.
Forced cooling operation
 Using the indoor unit ON/OFF switch
Press the indoor unit ON/OFF switch for at least 5 seconds. (The operation will start.)
• Forced cooling operation will stop automatically after around 15 minutes.
To stop the operation, press the indoor unit ON/OFF switch.
 Using the indoor unit's remote controller
• Please read about the procedure in "Trial operation from remote controller" in the installation manual attached to the
indoor unit. Please set the operation mode to "cooling".
English
Up to 15m
Not less than 10 min.
(1)
GWP = global warming potential
More than 15m
Not less than 15 min.
The filled out label must be adhered in the
proximity of the product charging port
(e.g. onto the inside of the stop valve cover).
Contains fluorinated greenhouse gases
1
GWP: 675
2
2
1
1
+
2
GWP × kg
1000
5
6
factory refrigerant charge of the
product:
see unit name plate
additional refrigerant amount
charged in the field
total refrigerant charge
=
kg
greenhouse gas emissions of the
total refrigerant charge expressed
=
kg
as tonnes CO
refrigerant cylinder and manifold
for charging
kg
=
outdoor unit
=
tCO
eq
2
Liquid
stop valve
Gas
stop valve
Service port
-equivalent
2
-equivalent)
2
Hexagonal
wrench
Close
Valve cap
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents