Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
8 Disassembly and assembly / 8.1 Introduction

8 Disassembly and assembly

8.1 Introduction

© Copyright 2020 . All rights reserved.
CAUTION
Working on the cartridge group
For safety and product liability reasons, work on the cartridge group
that is not described in the operation manual should only be carried out
by trained specialists at an ABB Turbocharging Service Station.
Unqualified work on the cartridge group can lead to total system
u
failure and void the warranty.
Mark the casing position for assembly.
u
Identifying assembly devices
Not all assembly devices are marked with a part number. They can be
identified using the tool list. This list is enclosed in the toolbox.
WARNING
Maintaining assembly devices
Assembly devices must be checked for damage before and after use.
Check visually for corrosion, cracks, deformation and wear.
u
Don't use damaged assembly devices, but replace them.
u
Customer spare part set
Before beginning work, ensure that the required customer spare part
sets are available.
See chapter Spare parts.
u
Tightening torques for turbocharger components
The specified tightening torques of screw connections for turbocharger
components must be observed (see section Table of tightening
torques).
Tightening torques for assembly devices from ABB Turbocharging
Unless otherwise described, the screws and nuts of the assembly
devices must be secured so they are tight-fitting.
HZTL2481_EN
Rev.D
March 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ht846380

Table of Contents