Crown ECX-16 Installation & Operation Manual page 16

Electric cabinet base convection steamer
Table of Contents

Advertisement

ELECTRIC CABINET BASE CONVECTION STEAMER, ECX-16, ECX-24
6.0 PERIODIC MAINTENANCE (Continued)
CAUTION: If heater does not shut off during blowdown, immediately
discontinue use of appliance and call for service.
Continue draining water for about fifteen (15) seconds, from control until water is clean.
Manually close valve. Recheck gauge glass. If water level has dropped significantly, wait for
the boiler to restore water level and pressure and repeat if necessary.
1. Water level control should be opened daily to blow down sediment and scalant.
2. Observe that the water in gauge glass is clean and clear. Extreme murkiness in water
indicates inadequate water quality.
3. Safety valve should be tripped during operation once a week to assure that it functions
properly.
4. De-scaling is based on water quality and usage.
CAUTION: Take extra caution when blowing down water level
control or tripping safety valve as extreme hot water and live steam
are present.
REMOVAL OF SCALE DEPOSITS
This equipment should be installed with the Middleby TruH20 water treatment system which,
when properly maintained can provide a scale-free environment for your steamer. However,
because water quality can vary it is recommended that the steamer be checked every 90 to 120
days for scale build up. Regular maintenance should be carried out at this time.
MANUAL 10063R4
INSTALLATION AND OPERATION MANUAL,
16
2020-07-08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecx-24

Table of Contents