ASSEMBLY
DRIVE LINE ATTACHMENT TO IMPLEMENT
CV DRIVE LINE
1. Secure the opposite end to the power divider
CV Joint
gearbox using the tapered pin and locknut.
To Tractor
Tighten nut to 30 ft. lbs.
PTO
2. Install drive line with the CV body attaching to
the tractor PTO.
3. Pull on each drive line section to make certain it
is securely attached.
4. Do not chain the CV bell shielding.
Power Divider
Gearbox
2215/12215 07/20
Assembly Section 3-8
© 2020 Alamo Group Inc.