Download Print this page

Advertisement

Quick Links

Multi-Tyres simultaneous Inflation&N2P Feature
Nitrogen Tyre Inflation System Operation Steps
1. Set final target pressure using the + and - buttons. The LCD
screen will show the target pressure.
2. Connect air hose(s) to tire valve stem(s).
3. Turn red valve handle to the "FILL" position.
4. Press "FILL/PURGE" once for standard inflation or Push
and hold "FILL/PURGE" for 2 seconds for nitrogen
conversion.
5. When unit "beeps" and the LCD screen flashes the target
pressure, tire inflation is complete.
6. Allow 15 seconds for the pressure in all tires to equalize,
then turn red valve handle to the "STOP" position.
7. Immediately remove hose(s).
1
Model:PN-8830

Advertisement

loading

Summary of Contents for Priman PN-8830

  • Page 1 Model:PN-8830 Multi-Tyres simultaneous Inflation&N2P Feature Nitrogen Tyre Inflation System Operation Steps 1. Set final target pressure using the + and - buttons. The LCD screen will show the target pressure. 2. Connect air hose(s) to tire valve stem(s). 3. Turn red valve handle to the “FILL” position.
  • Page 2 Model:PN-8830 1.0 Introduction 1.1 This Manual Congratulations on selecting the nitrogen tire inflation equipment. Please read and familiarize yourself with this manual before attempting to use this unit. Although this unit is very simple to operate, the user will be working with high-pressure gas that must be handled with caution.
  • Page 3 Model:PN-8830 2.0 Assembly 1. Unpack the carton and identify the components. Description Quantity Generator Unit System Pressure Gauge Tire Fill Hoses with Chucks Hose/Cord Storage Hooks Air Supply Caution Compressed air should be supplied to the unit with the air dried to a dew point temperature lower than the expected minimum ambient temperature.
  • Page 4 Model:PN-8830 3.0 Preparation for Use 1. Plug unit power cord into power source. 2. Connect a compressed air supply line to the inlet located on the Pre-Filter. 3. Turn the red handle of the Fill Control Valve (Fill/Stop Valve) to the “STOP”...
  • Page 5 Model:PN-8830 4.0 Control Panel 4.1 Switch and Control Functions 1. "-": Reduce final target pressure 2. "+": Increase final target pressure Power Switch: Turns unit on and off 4. "FILL/PURGE": Inflation/Deflation start Fill Control Valve 6. Outlets: For tire fill hoses 7.
  • Page 6 Model:PN-8830 5.1 Topping-Off Tires with NITROGEN 1. Set the final target pressure. 2. Connect the tire fill hose(s) to the tire valve stem(s). 3. Turn the Fill Control Valve handle to the “FILL” position. 4. Press the "FILL/PURGE" button momentarily (for less than 1 second). The unit will inflate or deflate the tire(s) to the target pressure.
  • Page 7: Troubleshooting

    Model:PN-8830 6.0 Troubleshooting PROBLEM POSSIBLE CAUSE SOLUTION No display. No power supply Check power supply "FILL/PURGE" The inflation process does not The tire is deflated below 5 Press commence, even when the psi. pressure is set and the hose is The hose connector is faulty.
  • Page 8 Model:PN-8830 Program or PCB Error Reset machine by switching off power for 5 seconds. If error message reappears, replace PCB. Calibration Error Unit requires calibration, contact your local distributor or service agent. Automatic Calibration Check Reset machine by /Calibration Error switching off power for 5 seconds.
  • Page 9 2. Check that the inlet pressure is within recommended operating range. Weekly Clean unit as necessary. Every Six Months Replace filter elements. ZHUHAI PRIMAN AUTO MAINTENANCE EQUIPMENT CO.,LTD ADD:2# Plant, Minghong industry base Liangang industrial zone. Zhuhai City. Guangdong Province P.R. China. Tel:86-756-7799055 Fax:86-756-6210996 Email:zhpriman@zhpriman.com...